background image

A. 

Drill 1/8" x 1" deep pilot holes

 into the rough framing through the clearance holes in 

the top (head) and sides (jambs) of the unit frame.

B. 

On the sides of the door,

 drive #10 x 3-1/2" corrosion resistant wood screws through 

the door frame into the rough framing. Drive the screws until snug, DO NOT over-
tighten the screws. DO NOT bend or bow the unit frame.

5

 

INSTALLING THE INTERIOR INSTALLATION SCREWS

C. 

Apply sealant to each 
pilot hole drilled in the 
top (head) of the door 
frame,

 then insert a #10 x 

3-1/2" corrosion resistant 
screw into each hole.

FIXED JAMB

VENT JAMB

#10 x 3-1/2" 

corrosion resistant wood screw

Drill 1/8" diameter pilot

hole through the clearance

hole in the frame.

Sealant 

goes here

13/16" Pilot

ERIOR

INTERIOR

EXTERIOR

STUCCO

ERIOR

INTERIOR

EXTERIOR

STUCCO

5A

5B

5C

A. 

Insert door panel.

 From the exterior of the building, tilt the 

top of the panel toward the door frame and insert the top 
of the door panel into the top track. Move the bottom of the 
panel toward the door frame until it is vertical. Gently set the 
panel down into the bottom track. Adjust the panel clip and 
tighten the panel clip screw. 

Note: Be careful not to pinch your fingers between the 
two panels. DO NOT close the sliding panel until you have 
installed the hardware. The door may lock when closed.

B. 

Install the handles and panel retainer.

 Follow the instructions included in the hardware 

package. If the panel is not square to the door frame, adjust the bottom rollers by 
removing the adjusting hole cover and inserting an 8" long #2 Phillips screwdriver into 
the hole. Turn clockwise to raise the panel and counter-clockwise to lower the panel.

C. 

Install screen.

 Instructions for installing the screen are found in the screen door package.

TWO OR MORE PEOPLE WILL BE REQUIRED TO HANDLE THE PANEL SAFELY.

6

 

REINSTALL THE SLIDING PANEL

6A

6A

Содержание 81CM0100

Страница 1: ...d additional care Determining the appropriate installation method is the responsibility of you your architect or construction professional If you have questions please contact your local Pella retaile...

Страница 2: ...asure Level Sealant gun Square Hammer Screwdriver Utility knife Wide jaw pliers Reciprocating saw 1 8 and 1 4 drill bit Drill 4 5 4 5 Installation will require two or more persons for safety reasons 1...

Страница 3: ...ealant and other debris from the door opening 2B NOTE 2B 2B 2A F If the weep holes of the existing sill have been cut away drill new weep holes in the existing door jambs Be sure to drill weep holes i...

Страница 4: ...ound the end of the pan Dry t the sill pan and the door into the opening J If there is a step down at the exterior of the door opening cut the sill nosing to the rough opening width plus two times the...

Страница 5: ...2L M If using sill nosing with a step down Install the sill pan and sill nosing into the opening Press down to seal them into the opening DO NOT overlap N Apply sealant at nosing ends continuing from...

Страница 6: ...B Remove the shipping spacers Carefully slide the movable panel halfway open and remove the spacers from both the top and bottom of the movable panel C Remove the venting panel by lifting it off of th...

Страница 7: ...o the opening and that the door anges will overlap the stucco or existing aluminum door frame by a minimum of 1 2 on all sides REMOVE THE DOOR FROM THE OPENING D Place three 3 8 beads of sealant Place...

Страница 8: ...Note If the dimensions are not equal check to make sure the ns are folded out to 90 at all points K Secure the frame Insert a 1 wide shim behind the pilot hole at the lock strike s Insert a 8 x 2 1 2...

Страница 9: ...corrosion resistant wood screws through the holes in the threshold in to the oor Note For concrete oors use masonry screws a minimum size of 3 16 x 3 1 2 4N L Apply sealant and insert a 8 x 2 1 2 pan...

Страница 10: ...he exterior of the building tilt the top of the panel toward the door frame and insert the top of the door panel into the top track Move the bottom of the panel toward the door frame until it is verti...

Страница 11: ...ion of the foam and will minimize squeeze out Apply sealant across the interior surface of shims to create a continuous seal For doors with jamb extensions installed ensure the foam is placed between...

Страница 12: ...urface Clad Exterior Frame The exterior frame is protected by aluminum cladding with our tough EnduraClad baked an factory nish that needs no painting Clean this surface with mild soap and water DO NO...

Страница 13: ...ruction must anticipate some water in ltration it is important that the wall system be designed and constructed to properly manage moisture Pella Corporation is not responsible for claims or damages c...

Отзывы: