B. 

Insert the window from the exterior of the building.

 Place the seat of the window at the 

bottom of the opening and slide the top into position. Center the window between the sides 
of the opening to allow clearance for shimming. 

TWO OR MORE PEOPLE WILL BE REQUIRED FOR THE FOLLOWING STEPS

2C

Note: If cross bracing is required for soffit 
installation of the cable systems, proceed to Step 3A 
and install cross bracing before unit is inserted into 
the rough opening.

C. 

Place temporary bracing 

under the seat of the 

window to raise the unit level.

D. 

Place a shim

 near the top of the one jamb board, 

aligned with the top pre-drilled hole in the jamb 
board. Drill a pilot hole and partially insert a #10 x 3" 
flat head screw provided. Repeat for the other jamb.

E. 

Continue placing shims at each pre-drilled 
installation screw hole in the jamb boards

 to plumb 

and square the window. Check window for squareness 
by making sure diagonal measurement for corner to 
corner is within 1/8" in both directions. Insert a #10 
x 3" flat head wood screw into each pre-drilled hole in 
the jamb boards. Finish inserting the top screw in each 
jamb board.

2

PREPARING AND SETTING THE WINDOW (CONTINUED)

Interior

2E

Interior

2E

F. 

If desired, shim and fasten headboard to rough opening. 

To keep plywood straight, center 

one finish head screw or 10D finish nail on units less than 10 feet wide and equally space two 
fasteners on units wider than 10 feet.

3

CABLE CLAMP INSTALLATION

Install Cable Clamps based on type of installation 
needed. Cross Bracing Installation consists of 
attaching 2 x 6 cross bracing between the rafter 
tails. Header Mount Installation consists of 
attaching to a solid structural member - header, 
sill plates or wall stud.

Note: Support cables are installed in factory 
assembled bay and bow combinations.

Cross bracing mount

Header 
mount

T-nut

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

Содержание 81470102

Страница 1: ...ion in a wall system designed to manage water These instructions are not to be used with any other construction method Installation instructions for use with other construction methods multiple units...

Страница 2: ...knife Drill with a 2 Phillips at least 4 long and 3 square drive bit provided in cable clamp kit 1 2 open end wrench 3 16 wrench or socket Sealant Gun Installation will require two or more persons for...

Страница 3: ...k and rough opening Apply sealant at each joint between the brick blocking and rough opening and cover the joints with flashing tape H Apply sill flashing tape 1 Wood wall construction only Cut a piec...

Страница 4: ...tape 2 Cut a piece of flashing tape 12 longer than the opening width Apply at the bottom overlapping tape 1 by at least 1 DO NOT allow the tape to extend past the interior face of the opening Note The...

Страница 5: ...Check window for squareness by making sure diagonal measurement for corner to corner is within 1 8 in both directions Insert a 10 x 3 flat head wood screw into each pre drilled hole in the jamb boards...

Страница 6: ...etween the rafter tails directly above the cable holes in the bay bow head board B Remove the cable from the bay bow unit Measure the distance from the bottom of the cable clamp to the bottom of the h...

Страница 7: ...put on the seat board knee braces must be used in addition to the cables HEAD BOARD SEAT BOARD 18 PROJECTION MAXIMUM DASHED LINES INDICATE POSSIBLE CONSTRUCTION FOR GABLE ROOF MINIMUM 10 1 2 HEADER MO...

Страница 8: ...space between the window and the rough opening and apply a 1 deep bead of foam This will allow room for expansion of the foam and will minimize squeeze out If using foam other than Great Stuff Window...

Страница 9: ...Foam BRICK FRAMED REPLACEMENT 3 8 Clearance Backer Rod and Sealant typical Insulating Foam BRICK SMALL BLOCK REPLACEMENT Air Gap Block 1 x 2 Sheet Rock Lathe Plaster Insulating Foam 3 8 Clearance Bac...

Страница 10: ...ween the frame expander and the under side of the seat board F Shape tool and clean excess sealant When finished the sealant should be the shape of an hourglass Note This method creates a more flexibl...

Страница 11: ...cess sealant When finished the sealant should be the shape of an hourglass Note Backer rod adds shape and depth for the sealant line This method creates a more flexible sealant line capable of expandi...

Страница 12: ...construction and maintenance failure to install Pella products in accordance with Pella installation instructions or the use of Pella products in wall systems which do not allow for proper management...

Отзывы: