Pella 81470102 Скачать руководство пользователя страница 3

1

ROUGH OPENING PREPARATION (CONTINUED)

1" 

1/2" 

1/2" 

6" 

1H

1I

Flashing tape 

overhanging 1"

to the exterior.

6" 

1H

Flashing tape 

at the exterior edge 

of the opening

F. 

Confirm wall depth measurement.

 Measure bottom board cutback on unit to make sure it is 

larger than the distance from the interior of wall to exterior of wall. If necessary, remove or cut 
siding.

G. 

 REPLACEMENT  APPLICATIONS:  Seal between exterior cladding and wall.

 If exterior 

cladding is siding, apply sealant between the siding and rough opening at the head and jambs 
and cover with flashing tape according to Express Replacement - No Siding Removal Opening 
Preparation for Siding: Vinyl, Steel , Aluminum.’  If exterior cladding is brick, add blocking 
at jamb to close the cavity between the brick and rough opening. Apply sealant at each joint 
between the brick, blocking and rough opening and cover the joints with flashing tape. 

H. 

Apply sill flashing tape #1.

 (Wood wall construction only). Cut a piece of flashing tape 

12" longer than the opening. Apply at the bottom up to the exterior edge of the  opening as 
shown. If the sheathing or water barrier 
is exposed, overlap 1" to the exterior as 
shown in (1I).

Note: The tape is cut 12" longer than  
the width so it will extend 6" up each 
side of the opening.

I. 

Tab the sill flashing tape and fold

 (If 

tape #1 overhangs 1" to the exterior). 
Cut 1" wide tabs at each corner (1/2" 
from each side of the corner) (1I). Fold 
tape to the exterior and press firmly to 
adhere it to the water resistive barrier.

Measure 

This 

Distance

PRESS

SEALANT

INTO 

OPENING

HEAD

AND

JAMBS

ONLY

1G

1G

1G

1G

1” 

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

REPL

 

APPS

REPL

 

APPS

REPL

 

APPS

REPL

 

APPS

REPL

 

APPS

REPL

 

APPS

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

ALL

Содержание 81470102

Страница 1: ...ion in a wall system designed to manage water These instructions are not to be used with any other construction method Installation instructions for use with other construction methods multiple units...

Страница 2: ...knife Drill with a 2 Phillips at least 4 long and 3 square drive bit provided in cable clamp kit 1 2 open end wrench 3 16 wrench or socket Sealant Gun Installation will require two or more persons for...

Страница 3: ...k and rough opening Apply sealant at each joint between the brick blocking and rough opening and cover the joints with flashing tape H Apply sill flashing tape 1 Wood wall construction only Cut a piec...

Страница 4: ...tape 2 Cut a piece of flashing tape 12 longer than the opening width Apply at the bottom overlapping tape 1 by at least 1 DO NOT allow the tape to extend past the interior face of the opening Note The...

Страница 5: ...Check window for squareness by making sure diagonal measurement for corner to corner is within 1 8 in both directions Insert a 10 x 3 flat head wood screw into each pre drilled hole in the jamb boards...

Страница 6: ...etween the rafter tails directly above the cable holes in the bay bow head board B Remove the cable from the bay bow unit Measure the distance from the bottom of the cable clamp to the bottom of the h...

Страница 7: ...put on the seat board knee braces must be used in addition to the cables HEAD BOARD SEAT BOARD 18 PROJECTION MAXIMUM DASHED LINES INDICATE POSSIBLE CONSTRUCTION FOR GABLE ROOF MINIMUM 10 1 2 HEADER MO...

Страница 8: ...space between the window and the rough opening and apply a 1 deep bead of foam This will allow room for expansion of the foam and will minimize squeeze out If using foam other than Great Stuff Window...

Страница 9: ...Foam BRICK FRAMED REPLACEMENT 3 8 Clearance Backer Rod and Sealant typical Insulating Foam BRICK SMALL BLOCK REPLACEMENT Air Gap Block 1 x 2 Sheet Rock Lathe Plaster Insulating Foam 3 8 Clearance Bac...

Страница 10: ...ween the frame expander and the under side of the seat board F Shape tool and clean excess sealant When finished the sealant should be the shape of an hourglass Note This method creates a more flexibl...

Страница 11: ...cess sealant When finished the sealant should be the shape of an hourglass Note Backer rod adds shape and depth for the sealant line This method creates a more flexible sealant line capable of expandi...

Страница 12: ...construction and maintenance failure to install Pella products in accordance with Pella installation instructions or the use of Pella products in wall systems which do not allow for proper management...

Отзывы: