background image

4

SECURING THE WINDOW

A. 

Install a #10 x 3-1/2" corrosion 
resistant wood screw

 into each pre-

drilled screw hole.

Note: Minimum 1-1/4" embedment 
into the wall framing is required.

 

Proceed to Step 6.

Ř

ALL

 WINDOWS 

Ř

 ALL

 WINDOWS 

Ř

 

5

INSTALLATION CLIP METHOD

A. 

Fasten the window to the opening 

by driving two  

#6 x 1-1/2" or longer corrosion resistant screws into 
the pre-punched holes in the clips. If clips are bent and 
fastened to the interior stud/block, install the screws as 
close to the bend as possible.

Note: DO NOT shim above the window. 

INTERIOR

6A

5A 

#10 x 3-1/2" 

corrosion 

resistant 

wood screw

4A

5A

Caution: Ensure use of low pressure polyurethane window and door insulating 
foams and strictly follow the foam manufacturer’s recommendations for 
application. Use of high pressure foams or improper application of the foam may 
cause the window frame to bow and hinder operation.

6

INTERIOR SEAL

{

6A

A. 

Apply insulating foam sealant. 

From the interior, insert 

the nozzle of the applicator into the space between the 
window and the rough opening approximately 1" past 
the edge of the frame (and past the jamb extensions) 
and apply a 1" deep bead of foam. This will allow room 
for expansion of the foam and will minimize squeeze 
out. Apply sealant across the interior surface of the 
shims to create a continuous seal. Follow foam 
manufacturer's instructions.

Note: DO NOT place any foam between jamb 
extensions and the rough opening.

Note: DO NOT completely fill the space from the 
back of the fin to the interior face of the opening.

Ř

PERFORMANCE UPGRADE & HURRIC

ANESHIELD 

WINDOWS 

Ř

Содержание 801U0103

Страница 1: ...aintenance instructions may void your Pella product warranty See Limited Warranty for complete details at http warranty pella com INSTALLATION INSTRUCTION STANDARD PERFORMANCE UPGRADE AND HURRICANESHI...

Страница 2: ...framing members REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT A Make sure the bottom of the opening is level Note It is critical the bottom is level for the window to be installed correctl...

Страница 3: ...s If installation ns are used place the clip so that the lip is facing up and against the installation n at the locations shown in the placement diagram If installation ns are not used the clip lip fa...

Страница 4: ...or sealant details Center window between the sides of the opening to allow clearance for shimming and insert one 6 x 1 1 2 or longer screw into one hole in each of the top corner clips This will hold...

Страница 5: ...window Press the tape down rmly while folding down the excess tape at the top and bottom of the window Note DO NOT tape or seal the bottom nailing n C Apply top ashing tape Cut a piece of ashing tape...

Страница 6: ...to circle top windows Several pieces of ashing tape will be needed to cover the top n Start taping from the sides of the window working toward the peak To determine the length of cuts hold the tape a...

Страница 7: ...ctly follow the foam manufacturer s recommendations for application Use of high pressure foams or improper application of the foam may cause the window frame to bow and hinder operation 6 INTERIOR SEA...

Страница 8: ...nstructions for these and any other applications 7 45 4 MFBSBODF BDLFS 3PE BOE 4FBMBOU UZQJDBM OTVMBUJOH PBN 1FSJNFUFS 4FBMBOU NVTU FYUFOE UP SPPNTJEF PG DDFTTPSZ SPPWF DDFTTPSZ SPPWF 800 4 8 5 53 OTV...

Страница 9: ...eel wool BE CAREFUL NOT TO SCRATCH THE GLASS Remove sanding dust Note To maintain proper product performance do not paint nish or remove the weather stripping mohair dust pads gaskets or vinyl parts A...

Страница 10: ...per management of moisture within the wall systems The determination of the suitability of all building components including the use of Pella products as well as the design and installation of allow f...

Отзывы: