background image

D. 

Fold down top flap of water resistive barrier (3D).

E. 

Apply flashing tape to diagonal cuts. 

Cut 

pieces of flashing tape at least 1" longer than the 
diagonal cuts in the water resistive barrier. Apply 
the tape covering the entire diagonal cut in the 
water resistive barrier at both upper corners of 
the window. If vertical cuts were also made, apply 
flashing tape to them in the same manner.

Note: The top tape must overlap the tape below 
it to divert water properly. Be sure to overlap 
the top corners (3E).

3

INTEGRATING THE WINDOW TO THE WATER  
RESISTIVE BARRIER (CONTINUED)

Note: If installing the window using 
installation clips, proceed to Step 5 - 
Installation Clip Method.

&YUFSJPS

Î

Î

3D

3E

Î

3E

C1. 

Apply top flashing tape to circle top windows.

 Several pieces of flashing tape 

will be needed to cover the top fin. Start taping from the sides of the window 
working toward the peak. To determine the length of cuts, hold the tape along the 
radius, and cut the tape just past where it leaves the top fixed extruded fin or for the 
flexible fin, just past the flexible weather strip. The top tape must overlap the one 
beneath it in order to divert water properly. The sharper the arc of the window, the 
shorter the pieces of tape will be.

3B

3C1

C2. 

Apply top flashing tape to an angle top window 1/2" up onto the frame 

cladding, over the top fin onto the sheathing. 

On the short side of a trapezoid 

window, do not allow the side flashing tape to extend higher than what the top 
tape will cover. Fold the overlapping tape down, and press all tape down firmly. 

Ř

WINDOWS 

Ř

 ALL

 WINDOWS 

Ř

 ALL

 WINDOWS 

Ř

 ALL

 WINDOWS 

Ř

 ALL

 WINDOWS 

Ř

ALL

 

Содержание 801U0103

Страница 1: ...aintenance instructions may void your Pella product warranty See Limited Warranty for complete details at http warranty pella com INSTALLATION INSTRUCTION STANDARD PERFORMANCE UPGRADE AND HURRICANESHI...

Страница 2: ...framing members REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT A Make sure the bottom of the opening is level Note It is critical the bottom is level for the window to be installed correctl...

Страница 3: ...s If installation ns are used place the clip so that the lip is facing up and against the installation n at the locations shown in the placement diagram If installation ns are not used the clip lip fa...

Страница 4: ...or sealant details Center window between the sides of the opening to allow clearance for shimming and insert one 6 x 1 1 2 or longer screw into one hole in each of the top corner clips This will hold...

Страница 5: ...window Press the tape down rmly while folding down the excess tape at the top and bottom of the window Note DO NOT tape or seal the bottom nailing n C Apply top ashing tape Cut a piece of ashing tape...

Страница 6: ...to circle top windows Several pieces of ashing tape will be needed to cover the top n Start taping from the sides of the window working toward the peak To determine the length of cuts hold the tape a...

Страница 7: ...ctly follow the foam manufacturer s recommendations for application Use of high pressure foams or improper application of the foam may cause the window frame to bow and hinder operation 6 INTERIOR SEA...

Страница 8: ...nstructions for these and any other applications 7 45 4 MFBSBODF BDLFS 3PE BOE 4FBMBOU UZQJDBM OTVMBUJOH PBN 1FSJNFUFS 4FBMBOU NVTU FYUFOE UP SPPNTJEF PG DDFTTPSZ SPPWF DDFTTPSZ SPPWF 800 4 8 5 53 OTV...

Страница 9: ...eel wool BE CAREFUL NOT TO SCRATCH THE GLASS Remove sanding dust Note To maintain proper product performance do not paint nish or remove the weather stripping mohair dust pads gaskets or vinyl parts A...

Страница 10: ...per management of moisture within the wall systems The determination of the suitability of all building components including the use of Pella products as well as the design and installation of allow f...

Отзывы: