LEASH INSTALLATION
1. Pull leash loop through the ring located
at the tail of the board
2. Pull knot through loop and pull tight
3. Open hook-and-loop fastener cuff
and attach leash to the leash loop
DEFLATION
1. Connect air hose to the IN valve of the pump.
2. Open the valve cap located on the board.
3. Connect air hose to the air valve on the board and turn 90° to
secure connection.
4. Depress using the pump.
5. Disconnect air hose from the air valve on the board.
6. Depress coloured valve pin and turn clockwise to lock the pin in
the ’’DOWN’’ position.
7. Beginning at the nose of the board, tightly roll up the SUP.
8. Close valve cap.
9