11
29
30
27
28
I. Install electric system
1.Connecting wire with control box (
See Fig.18
)
Note:(1)Specification of wire of limit switch and Air solenoid valve is 2×1
2
Wire cable for
power source and motor are 4×2.5
2
(2)Using white bobbin to wind around wire and air line.
2.Adjusting the current rating of thermal relay in control box according to the different
configurations of hydraulic power unit. In general, the electric current of thermal relay
should equal or larger than that of motor. The following table shows rated current
regulation of thermal relay in case of different hydraulic power unit
Hydraulic power unit
220V
3HP
380V
3HP
Rated current of
thermal relay
16A
12A
Connecting wire of Air
solenoid valve
Connecting wire of limit
switch
Connecting wire of
motor
Fig. 18
Connecting wire of
power
Connecting wire of
photoelectric switch
Содержание SML-2500
Страница 1: ...SINGLE POST LIFT Model SML 2500...
Страница 4: ...2 Arm Swings View Fig 2...
Страница 23: ...21 Control box exploded view Fig 35 Cylinder exploded view Fig 35 Fig 36...
Страница 35: ...33 72110301 10 2017...