3
B. SPECIFICATIONS OF CONCRETE
(See Fig. 3)
Specifications of concrete must be adhered to the specification as following.
Failure to do so may result in lift and/or vehicle falling.
1. Concrete must be thickness 100mm minimum and without reinforcing steel bars,
and must be dried completely before the installation.
2. Concrete must be in good condition and must be of test strength 3,000psi
(210kg/cm
²
) minimum.
3. Floors must be level and no cracks.
C. AIR SUPPLY
Air pressure requirement: 0.5Mpa~0.8Mpa, Air line size
¢
8
×¢
6 and
¢
6
×¢
4.
D. POWER SUPPLY
The electrical source must be 3HP minimum. The source cable size must be 2.5mm
²
and in good condition of contacting with floor.
III. STEPS OF INSTALLATION
A. Location of installation
Check and insure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B. Check the parts before assembly
1. Packaged lift and hydraulic power unit
(See Fig. 4)
.
Fig.
3
Fig.
4
Содержание AMGO 409
Страница 1: ...0 FOUR POST LIFT Model 409 A440...
Страница 9: ...7 D Install cross beams See Fig 11 Fig 12 3 1 3 Fig 12 Hole towards inside 2 Fig 11...
Страница 33: ...31 IV EXPLODED VIEW Model 409 A440 Fig 46 13...
Страница 34: ...32 CROSS BEAM CYLINDERS Fig 47 Fig 48 3...
Страница 35: ...33 CONTROL BOX SPX ELECTRIC POWER UNIT 220V 5HZ single phase Fig 50 Fig 49 Fig 50...
Страница 50: ...8 72114202 12 2015...