8
Push one of the provided black plugs into each of
8.
the holes in the Head End Wood once the Risers are
removed.
Route the Ropes through the Pulleys on the Tower
9.
Risers and through the Rope Cleats. Excess Rope
can be dropped in the holes located immediately in
front of the Cleats.
Assembling the Springs:
10.
Leg Springs: The Leg Springs are the longest
a.
springs included in the Kit. Attach a double
ended clip to each end of each Spring. Subse-
quently, clip a Foot Loop to one of the double
ended clips as shown
Arm Springs: The Arm Springs are the smallest
b.
in diameter and are attached to the Roll Down
Bar (the round, wooden bar with eyebolts at
each end). Attach a double ended clip to each
end of each Spring. Subsequently, attach the
Roll Down Bar as shown.
The Leg and Arm Springs are typically stored on
eyebolts located on the back side of the Tower.
However, they can be stored in any convenient
location.
STEP 8
STEP 9
STEP 10a
STEP 10b
Assembly (continued)
MVe_Tower_Owners_Manual-10_09.indd 8
12/4/09 4:21:23 PM