Peak Pilates MVe Reformer Mat Set Скачать руководство пользователя страница 17

17

Inspect:

Overall Machine: 

We highly recommend that you visually inspect the machine daily.

Springs:

 Even with extensive pre-testing and rigorous quality inspections, the possibility of spring failure exists. In addition, 

severe nicks or abrasions may develop as a result of misuse and could lead to premature spring breakage. Not replacing springs 
in a timely manner could also lead to failure. While breakage or deformation of a spring and the resulting potential for injury is 
a remote possibility, a daily inspection is critical. If, at any time, a gap between coils of a spring becomes evident, that spring 
needs to be replaced immediately.
 
The springs are zinc plated to prevent rust or corrosion from perspiration, condensation and/or humidity. Minor variations in the 
brightness of the finish are the result of different plating batches and do not affect the performance of the springs.

Tracking System:

 The shielded bearings in the Carriage Wheels are permanently lubricated and require no further service. You 

should inspect the Axles every two months. Remove any debris that might be entwined between the Wheels and Carriage Frame 
and tighten the Axles if any Wheel “play” is evident.

Hardware:

 All hardware should be checked every 2 months to make sure that every nut, bolt and fastener is secure.

Maintaining the MVe

®

 Reformer and Tower

Part

Daily

Weekly

Bi-MonthlyAnnually As Needed

Inspect:

Overall Machine
Springs

Tracking System

     (Carriage rollers)

Hardware

Clean:

 

Frame
Upholstery
Tracking System

Replace:

Springs
Ropes
Double Loops
Safety Clips

You have purchased a high quality piece of equipment that is constructed of the finest components and materials. Proper care 
requires only a small, but very important investment of time in a routine maintenance program.  
 
Maintenance procedures follow the same guidelines provided in your original MVe Reformer manual.

MVe_Tower_Owners_Manual-10_09.indd   17

12/4/09   4:21:33 PM

Содержание MVe Reformer Mat Set

Страница 1: ...MVe Reformer Tower Conversion Kit MVe Reformer Tower Retrofit Kit MVe Reformer Mat Set MVe_Tower_Owners_Manual 10_09 indd 1 12 4 09 4 21 16 PM...

Страница 2: ...truct all individuals whether they are end users or supervising personnel on the proper use of the equipment Inspect the machine including all structural and mechanical components hardware springs and...

Страница 3: ...ndicated below This product carries a two year limited warranty on the Tower structural components All other components with the exception of the upholstery straps and loops are covered by a one year...

Страница 4: ...Clips Qty 2 4 Roll Down Bar 5 Safety Chain w 2 Safety Links 6 Foot Loops 7 Push Through Bar Storage Strap 8 Push Through Bar Spring w Quick Snap Clip and Safety Link 9 Push Through Bar Sleeve 10 Leg S...

Страница 5: ...x 30mm long Button Head Cap Screw Qty 2 D 8mm Hex Nut Qty 8 E 8mm Washer Qty 20 A Foot End Mat B Head End Mat Tower Mounting Hardware Pack A 8mm x 30mm long Button Head Cap Screw Qty 8 B 8mm Washer Q...

Страница 6: ...ombination Tool 2 Phillips Screwdriver 13mm Wrench 17mm Wrench 2 6mm Allen Wrench Note Only used for retrofit 3 5mm Allen Wrench 1 2 1 2 3 Retrofit Kit Additional Components Tools Included MVe_Tower_O...

Страница 7: ...s 10 8mm washers and 4 8mm nuts assemble the 2 Upper Tower Connecting Tubes to the brackets located under the Head End Cross Member as shown Do not fully tighten the fasteners at this point With the h...

Страница 8: ...lip to each end of each Spring Subse quently clip a Foot Loop to one of the double ended clips as shown Arm Springs The Arm Springs are the smallest b in diameter and are attached to the Roll Down Bar...

Страница 9: ...ne end and a Quick i Snap Clip with Thumb Screw to the oppo site end of the PTB Spring The PTB Spring can be stored as shown in ii the accompanying photo The Safety Chain is stored by hooking one iii...

Страница 10: ...mer on 3 its side and allow it to come to rest against the Foot Bar Removing Replacing the Head End Leg 4 Tool Required 5mm Allen Wrench a While the assistant continues to hold the unit using a 5 mm A...

Страница 11: ...n Wrench Removing Replacing the Head End Cross Member Using a 17mm Open End Wrench or Pliers to a hold the flats of the Shaft loosen and remove both of the assembly screws for the Telescoping Lift Han...

Страница 12: ...step 4c Slide the plastic end cap back over the rails i making sure that the wood is properly seated If the tabs located on the top of the left and right corners of the plastic get caught on the Cross...

Страница 13: ...fully engaged before beginning any exercises Converting to Mat with or without Tower The Mat Set includes two mats one for the head end of the machine and one for the foot end The Foot End Mat is iden...

Страница 14: ...1 Fold the Foot Bar so it rests on the Gear Block b Positioning Plate and the Gear Bar Support Bar so its hooks rest on the Foot Bar as shown Flip the Pulleys into the storage position the c pulleys...

Страница 15: ...Bar as shown same position as is used for stacking Follow Steps 3 c d and e c No Rev units oblong Gear Bar without Tower 6 Place the Gear Bar in position 3 see 5 a g Fold the Foot Bar down on to the...

Страница 16: ...iage Stop located on the underside of the Foot End Mat Place the Head End Mat onto the rails butted 9 against the Foot End Mat You may have to slightly compress the foam between the Head and Foot End...

Страница 17: ...performance of the springs Tracking System The shielded bearings in the Carriage Wheels are permanently lubricated and require no further service You should inspect the Axles every two months Remove...

Страница 18: ...py water solution and dry thoroughly with a soft cloth Replace Springs All Springs must be replaced each year Any spring that exhibits early signs of fatigue for example separation in coils needs to b...

Страница 19: ...Information Peak Pilates 5555 Central Avenue Suite 200 Boulder Colorado 80301 303 998 1531 Worldwide 1 800 925 3674 North America 1 303 473 9142 Fax MVe_Tower_Owners_Manual 10_09 indd 19 12 4 09 4 21...

Отзывы: