background image

 
 

 
 

3. Mounting the display onto the AWM125-120 Articulating arm

3. Final adjustment and cable management

SCREW LOCK TAB

NYLON ZIP TIE

6

Fig 4

Fig 5

Fig 6

1: With the display brackets  attached to the display,  lift and place the brackets on to the 

 in either the top middle or bottom slots.  

SEE FIG 4

2: Center the display from left to right on the mounting plate.
3: Screw the 1/4-20 screw (10) into the locking plate (13)
4: Place the locking tab assembly into the slots on the display bracket, and tighten the 1/4-20 screw (10) on each locking tab assembly. 

SEE FIG 5

mounting plate

Adjust by tightening the tension bolts to suit the desired freedom of movement 

See fig 6

1: 

Lift the tie holder(16) on the lock tab to allow access the bolt to adjust the tension on the arm center. Replace the tie holder (16) after adjustment.

3: Two other tension bolts can be tightened or loosened to suit. 

SEE FIG 6

2: Adjust the tilt by loosening the Tri knob on the side of the 

AWM125-120

 and adjust back or forward for best viewing angle. 

See fig 6

3: 

Place the plastic tie holders (16) in the desired holes, and using zip ties (14) attach the cables. 

4: Make sure you articulate the mount from side to side looking for any pinching of the cables.

MOUNTING PLATE

DISPLAY BRACKETS

LOCKING TAB ASSEMBLY

1/4-20 screw

large view

TENSION BOLTS

CABLE

TENSION ADJUSTMENT BOLT

TRI KNOB

Содержание AWM125-120

Страница 1: ...handling Please remember that if you remove the panel display from the wall later you will find the screw holes and anchor bolts for t mounting unit left on the wall Also note that long use of the panel display may discolor the wall around it due to its heat a airflow 1 Fig 1 All PDR mounts and adapters carry a limited lifetime warranty against defects in material and workmanship We are not liable...

Страница 2: ...work Injury could result from dropping heavy objects be installed must be capable of long term support of the total load of so be taken to ensure sufficient strength to vibration and other external forces panel display to fall and cause injury MAXIMUM WEIGHT 125 Lbs 57 Kg C a u t i o n I n s t a l l a t i o n o f u n i t i s t o b e c a r r i e d o u t b y q u a l i f i e d t e c h n i c i a n s o...

Страница 3: ...IRED PH M 06 40 00 M5 X 40 PAN HEAD PHILLIPS MACHINE SCREW 4 REQUIRED PH M 05 40 00 M8 X 16 PAN HEAD PHILLIPS MACHINE SCREW 4 REQUIRED PH M 08 16 00 M5 X 16 PAN HEAD PHILLIPS MACHINE SCREW 4 REQUIRED PH M 05 16 00 M6 X 16 PAN HEAD PHILLIPS MACHINE SCREW 4 REQUIRED PH M 06 16 00 32 ID X 75 OD X 1 00 LONG PLASTIC SPACER 4 REQUIRED SP E 32 10 01 M4 STEEL FLAT WASHER 4 REQUIRED FW M 04 09 00 PH M 04 1...

Страница 4: ...4 DRAWING SPECIFICATIONS Model AWM125 120 Single stud articulating wall mount 5 39 3 07 4 24 00 14 00 4 00 8 05 C L 4 67 20 7 15 DEG 5 DEG ...

Страница 5: ...sen the bottom bolt and set to a level position and re tighten the bolt 5 Pre drill and Install the center lag bolt and tighten SEE Fig 2 AWM125 120 item 11 and 12 1 Lay the display face down on a padded surface 2 Using the hardware supplied see page 3 attach the display bracket to the display SEE FIG 3 3 Check the depth of the mounting holes to assure you are using the proper length screws suppli...

Страница 6: ...Adjust by tightening the tension bolts to suit the desired freedom of movement See fig 6 1 Lift the tie holder 16 on the lock tab to allow access the bolt to adjust the tension on the arm center Replace the tie holder 16 after adjustment 3 Two other tension bolts can be tightened or loosened to suit SEE FIG 6 2 Adjust the tilt by loosening the Tri knob on the side of the AWM125 120 and adjust back...

Отзывы: