INITIAL INSPECTION AND ASSEMBLY
Carefully unpack the instrument and accessories. Inspect for
damages made in shipment. If any damage is found, notify your
Jenco representative immediately. All packing materials should be
saved until satisfactory operation is confirmed.
BEFORE YOUR FIRST USE
A.
Replace the Batteries
Replace the battery when the blinking
low battery indicator “BAT ” appears on
the lower left hand side of the LCD
screen. The instrument can operate
within specifications for
approximately2~3 hours after low
battery indicator appears.
1. Shown in the right figure.
2. Take off the battery cover.
3. Remove all of the old batteries and
insert a new set of batteries ensuring
the polarities are correct.
B.
Soak the Electrode, if
necessary for up to 24 hours
1. Remove the electrode cap covering the VisionPlus ORP meter.
2. Soak the ORP electrode in standard solution or distilled
water for 10 minutes before first use or after storage.
C.
Setup and Calibrate the Electrode and Meter
PCE-ORP 3
must be setup and calibrated before your first use.
Please follow the instructions detailed in section
USING V
PCE-
USING PCE-ORP 3
2
1
2