background image

 

 

Carbonization  depth:  concrete  carbonization  depth  is  a  kind  of  chemical  corrosion  of 
concrete,  and  the  process  reducing  concrete  alkalinity  is  called  concrete  carbonization. 
Carbonization  depth  value  can  be  obtained  according  to  the  relevant  methods  of 

Regulations

.  When  input  carbonization  depth,  only  have  to  input  a  number  between 

0.0mm and 6.0mm and then the apparatus can, according to the input carbonization depth 
value, calculate the concrete compressive strength value. 

 

Test  of  pump  concrete  strength,  set  the  curve  as  “national-pumping”.  According  to  the 

Regulations

, the apparatus calculate the corrected value of pump concrete  strength and 

strength-measuring curve, and the calculated concrete compressive strength value is the 
strength value of pump concrete. 

 

Strength-measuring  curve,  the  apparatus  has  four  optional  curves  in  total,  “national 
standard-pumping”,  “national  standard-non  pumping”,  “specific  curve  1”  and  “specific 
curve 2”. “National-pumping” curve is a strength-measuring curve formulated according to 
national unified curve and corrected value of pump concrete strength. When testing the 
concrete  compressive  strength,  shall  choose  “national  standard-pumping”  for  strength-
measuring curve. “National standard-non pumping” curve is a strength-measuring curve 
formulated according to national unified curve. For “specific curve 1” and “specific curve 
2”,  Test  Unit  can  formulate  specific  strength-measuring  curve  for  itself  according  to  the 
relevant  provisions  of 

Regulations

,  which  can  be  used  right  after  being  saved  in  the 

apparatus via equipped software, and the national standard curve is directly preset in the 
apparatus. 

 

Strength value displayed by test surface and rebound value at the same time; it is calculated 
in a different way from that used for the rebound strength value achieved by completing 
testing zone or structure test. According to the set parameters, rebound value is corrected 
accordingly,  and  then  the  strength  result  is  calculated  according  to  the  set  curve.  The 
treatment of average value and taking out the max and min value is not conducted, so this 
strength value is only a reference value. 

 

1.5.

 

Concrete Strength Calculation

 

1.5.1.

 

Concrete strength calculation under standard measuring mode. 

Under standard measuring mode, the parameters setting, strength curve and calculating 
method of the apparatus all conforms to the relevant provisions of Regulations.

 

Calculation rules of average rebound value of the testing zone:

 Each testing zone shall be 

at  least  tested  16  times.  After  16  times  measurements,  take  3  maximum  values  and  3 
minimum values out of the 16 rebound values, and get the average value of the remained 
10 rebound values. This average value is the average rebound value of testing zone.

 

Angular correction:

 when testing concrete casting side in non horizontal direction, angular 

correction  value  shall  be  added  to  average  rebound  value.  Angular  correction  value 
(Appendix 1). For example, average rebound value is 24, test angle is 30 upward, angular 
correction value is -2.8 and the corrected rebound value shall be 21.2.

 

Casting surface correction:

 when testing the concrete casting top surface or bottom surface 

in horizontal direction, casting surface correction value shall be added to average rebound 
value. Casting surface correction value (Appendix 2). For example, average rebound value 
is  24,  casting  surface  is  top  surface,  top  surface  correction  value  is  +2.1,  the  corrected 
rebound value is 26.1.

 

When  testing,  if  the  rebound  apparatus  is  in  non  horizontal  direction,  and  the  tested 
surface  is  non  concrete  casting  side,  shall  conduct  angular  correction  at  first  and  then 
conduct casting surface correction. For example, average rebound value is 24, test angle is 

Содержание PCE-HT 224E

Страница 1: ...pce americas com PCE Instruments UK Ltd Unit 11 Southpoint Business Park Ensign way Hampshire Southampton United Kingdom SO31 4RF From outside UK 44 Tel 0 2380 98703 0 Fax 0 2380 98703 9 info pce inst...

Страница 2: ...3 2 1 3 Setting the number of test zone 11 3 2 2 Test zone setup 12 3 2 2 1 Setting test angle 12 3 2 2 2 Setting poured surfaces 12 3 2 2 3 Setting carburized depth 12 3 2 2 4 Setting strength curve...

Страница 3: ...ta collection without changing the original physical structure of mechanical rebound apparatus in which way the optical coupler sensor has no contact nor friction with the mechanical part of rebound a...

Страница 4: ...guide bar 10 Hammer mass 11 Guide sleeve 12 Two part ring 13 Felt washer 14 Impact plunger 15 Cap 16 Retaining spring 17 Impact spring 18 Housing Aluminum ring 19 Housing upside 20 Pointer piece 21 Se...

Страница 5: ...ing zones 16 Maximum number of test points in a testing zone 16 times National unified curve 1 Customized curve 2 Battery can charge high capacity Li ion battery Data interface Mini USB interface Type...

Страница 6: ...at used for the rebound strength value achieved by completing testing zone or structure test According to the set parameters rebound value is corrected accordingly and then the strength result is calc...

Страница 7: ...30 upward casting surface is top surface If the angular correction value is 2 8 then the corrected rebound value is 21 2 if the angular correction value is 2 1 then the corrected rebound value is 23 3...

Страница 8: ...that is customized measuring mode such as the test times are less than 16 Calculation of average rebound value of testing zones After the testing maximum and minimum values are not taken out only con...

Страница 9: ...g curve can be modified After modification choose ok to exit and the apparatus will save the corrected content automatically 1 6 2 Testing zone is completed If the recoiling times reach the set test t...

Страница 10: ...2 Button Description...

Страница 11: ...measuring from the menu and press to enter measuring mode In this mode you can take measurement 3 2 Test mode setup Select Test mode setup from the menu and press to enter test mode setup interface 3...

Страница 12: ...t 3 2 1 2 Setting the number of test time In the interface of new part use upward and downward buttons to select Test time and press Enter button to enter setting interface Press and to adjust the num...

Страница 13: ...e parameter interface of new test zone use upward and downward buttons to select pouring surface and click Enter button to set pouring surface There are a total of 3 surfaces available Top surface Bot...

Страница 14: ...he parameter interface of test part After selection the default carburized depth of each test zone is the same as that of this test part The carburized depth of each test zone can be modified in the p...

Страница 15: ...er main menu select Test mode setup and press to enter test mode setup interface Select Re testing the current zone and press to re test the current zone The test no will return to 0 3 2 4 Basic Measu...

Страница 16: ......

Страница 17: ...nu 1 Exit from current menu and enter measuring interface 2 Re view part data review the results of completed test parts 3 Re view zone data review the results of completed test zones Enter Re view zo...

Страница 18: ...Data transfer Click Enter button to go to main menu Then select Data transfer and click Enter to enter Data transfer menu Before creating communication between instrument and PC use USB cable to conne...

Страница 19: ...er limit setup Set up upper lower limit of rebound value 00 60 Press and to change the number then press to save 3 6 4 Rights management In this menu user can enable disable and change password for th...

Страница 20: ...Press to move cursor to next number press to change current number from 0 to 9...

Страница 21: ...g interface in 30 power consumption in this mode the instrument could work 13 16 hours after fully charging In power saving measuring modes press to switch to normal measuring interface press again an...

Страница 22: ...3 6 8 Battery power Show the percentage of battery capacity 0 100...

Страница 23: ...the completion interface of test part and the measurement for the current test part is completed The completion interface of test part contains Review test part result Review test zone result New par...

Страница 24: ...wed After maintenance calibration test shall be conducted according to the requirements and the calibration value shall be 80 2 5 Introduction of PC software Thedata communication software is designed...

Страница 25: ......

Страница 26: ...n the desktop automatically Double click the shortcut to run the program The main interface of the software is a standard windows form containing the title bar menu bar and toolbar Please note After r...

Страница 27: ...ocess pointer block 22 shakes moves up to a certain place and stops there pointer block 22 rubs or bumps spring back hammer body 7 File the upper surface or two shoulders of pointer block 22 appropria...

Страница 28: ...The shock surface of recoiling hammer mass 10 is dirty Clean the dirt on casting surface 5 The friction between recoiling hammer mass 10 and central guide rod increases Wipe the hammer guide bar 9 wi...

Страница 29: ...28 2 29 1 31 17 6 18 9 19 6 21 0 24 9 28 2 29 1 30 0 30 9 32 19 1 20 8 21 2 22 7 26 5 29 8 30 7 31 6 32 5 33 20 8 22 0 22 7 24 3 28 2 31 6 32 5 33 5 34 4 34 22 4 23 6 24 5 26 0 30 0 33 3 34 2 35 2 36...

Отзывы: