![Payter APM01 PAY V1-X Series Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/payter/apm01-pay-v1-x-series/apm01-pay-v1-x-series_user-manual_1513766023.webp)
User Manual
V1.3 - 202301
Page 23 of 43
9.2.3
EVA mounting option 2: no studs in machine
If the machine does not come with pre-installed studs:
1.
Position the supplied mounting frame on the front of the vending machine.
2.
Drill mounting holes with a diameter of 4 millimetres at the indicated well stud positions.
3.
Secure the mounting frame by placing the four M4 bolts supplied with the terminal.
For a clean and neat finish of the front, don’t forget to place the cover plat
e on the
mounting frame to cover the bolts. The cover plate is secured with double-sided
adhesive for a strong connection.
Figure 9: Section view of mounted Apollo terminal (left) and ApolloMax terminal (right)
Frame
Machine
Apollo
M4 bolts
Cover plate
Rubber
gasket
Rubber
gasket
Figure 10: ISO view mounting option 2