6 Commissioning [specialist]
24
996098460-mub-en – V02
2016/05
6.1
Preparations before flushing and filling
NOTICE
Note regarding the expansion tank
To prevent that dirt particles of the solar system are washed into the expansion tank, some
manufacturers recommend to disconnect the expansion tank from the solar circuit during
flushing and filling. Please observe the instructions of the manufacturer on this topic.
6.2
Flushing and filling the storage tank circuit (connections secondary)
The storage tank circuit is filled by means of the valves and fittings of the heating system.
To avoid that dirt particles are washed into the heat exchanger, shut the ball valves of the
module and wash out the present dirt particles/scale residues before the initial commissioning
of the tank.
Make sure to only use purified heating water according to VDI 2035 / Ö-Norm H 5195 1.
Содержание SolexMega-Kaskade HZ
Страница 37: ...8 Spare parts specialist 2016 05 996098460 mub en V02 37 8 2 Spare parts hydraulics primary circuit ...
Страница 38: ...8 Spare parts specialist 38 996098460 mub en V02 2016 05 8 3 Spare parts hydraulics secondary circuit ...
Страница 39: ...8 Spare parts specialist 2016 05 996098460 mub en V02 39 8 4 Spare parts installation set ...