5 Assembly and installation
2016/05
996098460-mub-en – V02
13
5
Assembly and installation
During operation, the access to the control and safety equipment must be guaranteed
at all time!
The discharge lines of the pressure relief valves must be conducted into heat-resistant
collecting containers of corresponding size. Thus, an uncontrolled discharging into the
environment is avoided and the refilling of the circuits is facilitated!
NOTICE
Material damage due to high temperatures!
As the solar fluid can be very hot near the collector, the group of fittings must be installed
at a sufficient distance from the collector field.
It may be necessary to install an intermediate tank to protect the expansion tank.
NOTICE
Damage to property!
The location of installation must be dry, load-carrying, frost-proof and protected against
ultraviolet radiation, in order to prevent material damage of the installation.
Содержание SolexMega-Kaskade HZ
Страница 37: ...8 Spare parts specialist 2016 05 996098460 mub en V02 37 8 2 Spare parts hydraulics primary circuit ...
Страница 38: ...8 Spare parts specialist 38 996098460 mub en V02 2016 05 8 3 Spare parts hydraulics secondary circuit ...
Страница 39: ...8 Spare parts specialist 2016 05 996098460 mub en V02 39 8 4 Spare parts installation set ...