4 Mounting and installation [specialist]
18
993x0463x-mub-en – V02
2020/03
1.
Take off the thermometer handles (A-
2, F-2) and remove the insulating front
shell of the HeatBloC
®
.
2.
Unscrew the nuts on the lower
connections of the HeatBloC
®
and
take out the sealing rings.
If a PAW modular distribution manifold or
transition connection is used:
3.
Put the two nuts over the flanges.
4.
Insert the sealing rings into the nuts.
5.
Put the HeatBloC
®
onto the two nuts.
6.
Tighten the nuts.
Make sure that the nuts do not get
jammed and that the sealing rings do
not slip.
7.
Connect the HeatBloC
®
to the
installation by using the pipes.
The installation to the piping must
be carried out without any tension.
8.
Connect the pump.
9.
Carry out a pressure test and check
all thread connections.
10.
Mount the insulating front shell and
the thermometer handles (A-2, F-2).
flange (top view)
nut
1
2
3
flange (side view)
sealing ring