Step 5:
If the 3/8” x 3/8” flared brass fitting
is screwed into the shorter feed line
hose please remove it at this time
and attach this fitting at the base
of the heater head. Tighten
securely. Do not use any
pipe sealant at this brass to
brass connection. Do not
over-tighten.
(See Figure #5)
Figure #5
Figure #6
Step 6:
Insert shorter feed line hose in
through rectangular access hole at
the bottom of the post and feed it
out the top of the post. Make sure
end of hose and regulator feed line
assembly is visible through
rectangular access slot at bottom of
post. This assembly has been pre-
assembled for you and leak tested.
Just to be safe, we will ask you to
leak test and double check all
fittings before using your new
heater.
(See Figure #6)
Step 7
:
Secure head to feed line at this
time. Be sure the 3/8” x 3/8” flare
brass fitting is tight where it
connects to the fitting at the base
of the heater head as well as at
the hose swivel fitting.. No
sealant is required at these
fittings. Do not over-tighten.
Brass to brass is an excellent
connection.
Do not secure
head to post at this time.
Figure #7
©
AEI CORPORATION 2005
13
Содержание NPC05
Страница 8: ...AEI CORPORATION 2005 8...