![Parr Instrument Company 6300 Скачать руководство пользователя страница 55](http://html1.mh-extra.com/html/parr-instrument-company/6300/6300_operating-instructions-manual_3774715055.webp)
M
ENU
O
PERATING
I
NSTRUCTIONS
6300
A
w w w . p a r r i n s t . c o m
55
Jacket Plot Symbol:
Toggles between: (same as Bucket Plot Color, p. 54).
Jacket Min Value:
Press this key to access its numeric dialog box to set a
minimum jacket value.
Time Window:
Sets the time scale for the X-axis.
Time Units:
Toggles between minutes and seconds.
Bucket Plot Color:
Toggles between:
Red
•
Green
•
Yellow
•
Blue
•
Magenta
•
Cyan
•
White
•
Black
•
Bucket Max Value:
Press this key to access its numeric dialog box to set a
maximum bucket value.
Jacket Plot Color:
Toggles between: (same as Bucket Plot Color, p. 54).
Jacket Max Value:
Press this key to access its numeric dialog box to set a
maximum jacket value.
Time Minimum:
Press this key to access its numeric dialog box to set the
least amount of time for the display.
Time Maximum:
Press this key to access its numeric dialog box to set the
greatest amount of time for the display.
O
PERATING
C
ONTROLS
M
ENU
Method of Operation:
Offers an operating mode of either dynamic or equilib-
rium. In most cases, the dynamic mode with its curve
matching capability will save approximately 3-4 minutes
per test and will produce the same operating precision
as the slower equilibrium mode.
Reporting Units:
Offers a choice of Btu/lb, cal/g, J/kg, or MJ/kg for the
reporting units. A user selected set of reporting units
may be chosen by selecting “other”.
Spiking Correction:
Accesses the Spike Controls sub-menu:
“Spiking” is the addition of material, such as benzoic
acid or mineral oil, to samples which are difficult to
burn in order to drive the combustion to completion.
Содержание 6300
Страница 2: ......
Страница 6: ...P a r r I n s t r u m e n t C o m p a n y TABLE OF CONTENTS 6 This page left blank intentionally...
Страница 10: ...PREFACE P a r r I n s t r u m e n t C o m p a n y 10 This page left blank intentionally...
Страница 16: ...2 INSTALLATION P a r r I n s t r u m e n t C o m p a n y 16 Figure 2 2 6300 Calorimeter Back Panel...
Страница 20: ...2 INSTALLATION P a r r I n s t r u m e n t C o m p a n y 20 This page intentionally left blank...
Страница 22: ...3 INSTRUMENT DESCRIPTION P a r r I n s t r u m e n t C o m p a n y 22 This page left blank intentionally...
Страница 26: ...4 PROGRAM INSTALLATION CONTROL P a r r I n s t r u m e n t C o m p a n y 26 This page intentionally left blank...
Страница 28: ...5 OPERATING INSTRUCTIONS P a r r I n s t r u m e n t C o m p a n y 28 Figure 5 1 Fill Flow Diagram...
Страница 32: ...5 OPERATING INSTRUCTIONS P a r r I n s t r u m e n t C o m p a n y 32 Figure 5 4 Rinse Cool Flow Diagram...
Страница 34: ...5 OPERATING INSTRUCTIONS P a r r I n s t r u m e n t C o m p a n y 34 Figure 5 5 Drain Flow Diagram...
Страница 38: ...5 OPERATING INSTRUCTIONS P a r r I n s t r u m e n t C o m p a n y 38 This page intentionally left blank...
Страница 40: ...6 CORRECTIONS FINAL REPORTS P a r r I n s t r u m e n t C o m p a n y 40 This page intentionally left blank...
Страница 44: ...8 FILE MANAGEMENT P a r r I n s t r u m e n t C o m p a n y 44 This page intentionally left blank...
Страница 76: ...B CALCULATIONS P a r r I n s t r u m e n t C o m p a n y 76 This page intentionally left blank...
Страница 94: ...E TECHNICAL SERVICE P a r r I n s t r u m e n t C o m p a n y 94 This page intentionally left blank...
Страница 107: ...PARTS LISTS DRAWINGS 6300 F w w w p a r r i n s t c o m 107 Figure F 4 6300 Oxygen Bomb Calorimeter Cutaway Left...
Страница 108: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 108 Figure F 5 6300 Oxygen Bomb Calorimeter Cover Open...
Страница 110: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 110 Figure F 7 A1251DD Oxygen Solenoid Assembly...
Страница 111: ...PARTS LISTS DRAWINGS 6300 F w w w p a r r i n s t c o m 111 Figure F 8 A1200DD Internal Plumbing Diagram...
Страница 112: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 112 Figure F 9 A1252DD Water Solenoid Assembly...
Страница 113: ...PARTS LISTS DRAWINGS 6300 F w w w p a r r i n s t c o m 113 Figure F 10 A1416DD Bomb Wash Pump Assembly and Fittings...
Страница 114: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 114 Figure F 11 A1254DD Circulatory Pump Assembly...
Страница 116: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 116 Figure F 13 A1256DD Water Assembly Tank...
Страница 117: ...PARTS LISTS DRAWINGS 6300 F w w w p a r r i n s t c o m 117 Figure F 14 A1257DD Water Regulator Assembly...
Страница 118: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 118 Figure F 15 A1258DD Temperature Control Assembly...
Страница 119: ...PARTS LISTS DRAWINGS 6300 F w w w p a r r i n s t c o m 119 Figure F 16 Cover Contact Pin Assembly...
Страница 120: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 120 Figure F 17 Stirrer Motor and Mount...
Страница 121: ...PARTS LISTS DRAWINGS 6300 F w w w p a r r i n s t c o m 121 Figure F 18 A1260DD Water Level Control Assembly...
Страница 122: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 122 Figure F 19 A1265DD Bucket Assembly...
Страница 123: ...PARTS LISTS DRAWINGS 6300 F w w w p a r r i n s t c o m 123 Figure F 20 6300 Air Can Assembly...
Страница 124: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 124 Figure F 21 A1450DD Bomb Head Assembly 1...
Страница 125: ...PARTS LISTS DRAWINGS 6300 F w w w p a r r i n s t c o m 125 Figure F 22 A1450DD Bomb Head Assembly 2...
Страница 126: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 126 This page left blank intentionally...
Страница 129: ......