![Parr Instrument Company 6300 Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/parr-instrument-company/6300/6300_operating-instructions-manual_3774715024.webp)
4
P
ROGRAM
I
NSTALLATION
& C
ONTROL
P a r r I n s t r u m e n t C o m p a n y
24
Calorimeter Operations
Operating Mode
Determination
Bomb Installed/EE
1/940.0
Heater and Pump
OFF
Operating Controls
Method of Operation
Dynamic
Reporting Units
BTU/lb
Use Spiking Correction
OFF
“OTHER” Multiplier
4.1868
Calibrate Touchscreen
LCD Backlight Timeout(s)
1200 S
LCD Backlight Intensity
70%
Print Error Messages
ON
Language
English
Spike Controls
Use Spiking
OFF
Heat of Combustion of Spike
6318.4
Use Fixed Spike
OFF
Weight of Fixed Spike
0.0
Prompt for Spike before Weight
OFF
Bomb Rinse Tank Control
Report Rinse Tank Empty
ON
Rinse Tank Capacity
150
# Rinses Left
150
Reset Rinse Tank Counter
Rinse Time
25
Rinse Flush Time
20
Clear Time
100
# of Rinse Cycles
3
Program Information and Control
Date & Time Settings
Volume Level Adjust
85%
Software and Hardware Info
Settings Protect
OFF
User/Factory Settings
Feature Key
Bomb Type Select
User Function Setup
Cold Restart
User/Factory Settings
User Setup ID
63-1138
Reload Factory Default Settings
Reload User Default Settings
Save User Default Settings
Compare settings with Factory Defaults
Calibration Data & Controls
Calibration Run Limit
10
EE Max Std Deviation
0.0
Heat of Combustion of Standard
6318.4
Bomb Service Interval
500
Use Bomb
1
Control Chart Parameters
Charted Value
HOC Standard
Process Sigma
0.1
Temp Rise High Warning
8.5
Temp Rise Low Warning
5.1
Bomb 1 Through 4
EE Value
800.0
Protected EE Value
OFF
Thermochemical Corrections Standardization
Fixed Fuse
ON 50.0
Acid Correction
Fixed HNO
3
8.0
Fixed Sulfur
ON 0.0
Determination
Fixed Fuse
ON 50.0
Acid Correction
Fixed HNO
3
8.0
Fixed Sulfur
OFF 0.0
Net Heat/Dry Factors
Calculation Factors
Nitric Acid Factor
1.58
Figure 4-1
6300 Factory Default Settings
Содержание 6300
Страница 2: ......
Страница 6: ...P a r r I n s t r u m e n t C o m p a n y TABLE OF CONTENTS 6 This page left blank intentionally...
Страница 10: ...PREFACE P a r r I n s t r u m e n t C o m p a n y 10 This page left blank intentionally...
Страница 16: ...2 INSTALLATION P a r r I n s t r u m e n t C o m p a n y 16 Figure 2 2 6300 Calorimeter Back Panel...
Страница 20: ...2 INSTALLATION P a r r I n s t r u m e n t C o m p a n y 20 This page intentionally left blank...
Страница 22: ...3 INSTRUMENT DESCRIPTION P a r r I n s t r u m e n t C o m p a n y 22 This page left blank intentionally...
Страница 26: ...4 PROGRAM INSTALLATION CONTROL P a r r I n s t r u m e n t C o m p a n y 26 This page intentionally left blank...
Страница 28: ...5 OPERATING INSTRUCTIONS P a r r I n s t r u m e n t C o m p a n y 28 Figure 5 1 Fill Flow Diagram...
Страница 32: ...5 OPERATING INSTRUCTIONS P a r r I n s t r u m e n t C o m p a n y 32 Figure 5 4 Rinse Cool Flow Diagram...
Страница 34: ...5 OPERATING INSTRUCTIONS P a r r I n s t r u m e n t C o m p a n y 34 Figure 5 5 Drain Flow Diagram...
Страница 38: ...5 OPERATING INSTRUCTIONS P a r r I n s t r u m e n t C o m p a n y 38 This page intentionally left blank...
Страница 40: ...6 CORRECTIONS FINAL REPORTS P a r r I n s t r u m e n t C o m p a n y 40 This page intentionally left blank...
Страница 44: ...8 FILE MANAGEMENT P a r r I n s t r u m e n t C o m p a n y 44 This page intentionally left blank...
Страница 76: ...B CALCULATIONS P a r r I n s t r u m e n t C o m p a n y 76 This page intentionally left blank...
Страница 94: ...E TECHNICAL SERVICE P a r r I n s t r u m e n t C o m p a n y 94 This page intentionally left blank...
Страница 107: ...PARTS LISTS DRAWINGS 6300 F w w w p a r r i n s t c o m 107 Figure F 4 6300 Oxygen Bomb Calorimeter Cutaway Left...
Страница 108: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 108 Figure F 5 6300 Oxygen Bomb Calorimeter Cover Open...
Страница 110: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 110 Figure F 7 A1251DD Oxygen Solenoid Assembly...
Страница 111: ...PARTS LISTS DRAWINGS 6300 F w w w p a r r i n s t c o m 111 Figure F 8 A1200DD Internal Plumbing Diagram...
Страница 112: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 112 Figure F 9 A1252DD Water Solenoid Assembly...
Страница 113: ...PARTS LISTS DRAWINGS 6300 F w w w p a r r i n s t c o m 113 Figure F 10 A1416DD Bomb Wash Pump Assembly and Fittings...
Страница 114: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 114 Figure F 11 A1254DD Circulatory Pump Assembly...
Страница 116: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 116 Figure F 13 A1256DD Water Assembly Tank...
Страница 117: ...PARTS LISTS DRAWINGS 6300 F w w w p a r r i n s t c o m 117 Figure F 14 A1257DD Water Regulator Assembly...
Страница 118: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 118 Figure F 15 A1258DD Temperature Control Assembly...
Страница 119: ...PARTS LISTS DRAWINGS 6300 F w w w p a r r i n s t c o m 119 Figure F 16 Cover Contact Pin Assembly...
Страница 120: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 120 Figure F 17 Stirrer Motor and Mount...
Страница 121: ...PARTS LISTS DRAWINGS 6300 F w w w p a r r i n s t c o m 121 Figure F 18 A1260DD Water Level Control Assembly...
Страница 122: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 122 Figure F 19 A1265DD Bucket Assembly...
Страница 123: ...PARTS LISTS DRAWINGS 6300 F w w w p a r r i n s t c o m 123 Figure F 20 6300 Air Can Assembly...
Страница 124: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 124 Figure F 21 A1450DD Bomb Head Assembly 1...
Страница 125: ...PARTS LISTS DRAWINGS 6300 F w w w p a r r i n s t c o m 125 Figure F 22 A1450DD Bomb Head Assembly 2...
Страница 126: ...F PARTS LISTS DRAWINGS P a r r I n s t r u m e n t C o m p a n y 126 This page left blank intentionally...
Страница 129: ......