GB
11
the assembly work is finished, a two-part
no-load test must be performed by raising
and lowering the winch and swinging the
swing arm 180° to the left and to the right.
Then the cable winch must be
incrementally loaded up to the maximum
permissible load weight. Only when the
cable winch/swing arm assembly
successfully passes these tests may the
equipment be used for normal operation.
8. Cleaning, maintenance and
ordering of spare parts
8.1 Cleaning and maintenance
Regularly clean the swing arm and lubricate
the hinge pins (5/19).
8.2 Ordering replacement parts:
Please quote the following data when ordering
replacement parts:
Type of machine
Article number of the machine
Identification number of the machine
For our latest prices and information please go
to www.isc-gmbh.info
9. Disposal and recycling
The unit is supplied in packaging to prevent its
being damaged in transit. This packaging is
raw material and can therefore be reused or
can be returned to the raw material system.
The unit and its accessories are made of
various types of material, such as metal and
plastic. Defective components must be
disposed of as special waste. Ask your dealer
or your local council.
Anleitung_2255411:_ 28.07.2009 15:27 Uhr Seite 11
Содержание P-SA 1200
Страница 7: ...7 22 1100 mm max 300 kg Anleitung_2255411 _ 28 07 2009 15 27 Uhr Seite 7...
Страница 23: ...23 Anleitung_2255411 _ 28 07 2009 15 27 Uhr Seite 23...
Страница 24: ...24 Anleitung_2255411 _ 28 07 2009 15 27 Uhr Seite 24...
Страница 25: ...25 Anleitung_2255411 _ 28 07 2009 15 27 Uhr Seite 25...