
XPR2/XPC2 PowerStation Series Hardware User Guide
Page 12 of 47
Installing the PowerStation
Once the location for the PowerStation has been prepared, you are ready to install the unit. To do so, you need
to mount the PowerStation to your enclosure using the supplied mounting clamps. The mounting
clamps secure
to the PowerStation using a sliding mechanism where the “feet” of the clamp slide into slots in the
PowerStation’s chassis and screws provide pressure to compress the seal gasket around the perimeter of the
PowerStation.
There are three styles of clamps used to mount the PowerStation to the enclosure depending on the display
size; 6”, 8”, 10” or 15”. To mount the PowerStation properly, refer to the instructions below that correspond with
the proper display size.
Non-Display XPR200/XPC200 PowerStation Mounting Procedures
To install an XPR200/XPC200 non display PowerStation, there are two options: mounting to a panel via the four
mounting ears provided or via the DIN rail adapter provided in the accessory ship kit included with the unit. To
mount the unit using the four mounting ears, complete the instructions below:
1) Drill four 5/32” (0.156”) mounting holes according to the XPR2/XPC2 mounting drawing supplied on
the XPR2/XPC2 Utilities, Drivers & Documentation CD supplied with unit and shown here for
reference:
2) Mount the non display unit using the four mounting ears and four supplied #6-32 screws and #6-32
nuts.