- 17 -
Section 5.0 – START UP PROCEDURE
There should be
NO
air flow through the dryer before or during start up. It is recommended that the
dryer be installed with bypass piping to better service the unit.
Smart Cycle Plus 80-100
1. Plug in unit.
2. Switch unit on. On / Off switch will light green when unit is running.
3. Unit is ready for operation.
Smart Cycle Plus 130 – 3000
1. After electrical connection (Refer to Section 3), apply power.
2. Leave power on for 8 hours before proceeding any further. (Both green load – unload thermal
bank LED’s should be OFF on the control panel).
3. Remove side panel from unit.
4. Some units are shipped with the refrigeration service valve
tagged
. These tagged service valves
must not
be opened until the dryer is ready to be started and the main power is permanently
applied.
Only tagged service valves must be opened
.
5. Locate
tagged
service valves and remove end cap from valve stem. (Fig. 3 below)
CAUTION
!
Содержание Airtek SMART CYCLE PLUS 100
Страница 6: ...6 Fig 2 Models 80 300...
Страница 25: ...25 Section 8 0 MAINTENANCE CHARTS Maintenance Log Service Performed Date Parts Replaced Initials...
Страница 26: ...26 Section 8 0 MAINTENANCE CHARTS cont Element Replacement Log Part No Date Initials...
Страница 27: ...27 Section 9 0 ASSOCIATED DRAWINGS...
Страница 28: ...28...
Страница 29: ...29...
Страница 30: ...30...
Страница 31: ...31...
Страница 32: ...32...
Страница 33: ...33...
Страница 34: ...34...
Страница 35: ...35...
Страница 36: ...36...
Страница 37: ...37...
Страница 38: ...38...
Страница 39: ...39...
Страница 40: ...40...
Страница 41: ...41...
Страница 42: ...42...
Страница 43: ...43...
Страница 44: ...44...