7 - Anchoring on flat ground with base box
Strada Evolution 2 - Transfer and Rapide - Installation manual
24 / 42
•
Drill 4 Ø20 holes in the ground, using the drawing below as the basis
(192 x 160).
Front of the terminal
•
Follow the order of drilling operations given below:
•
Put the base box in place and check that the bottom of the base box touches
the ground.
•
Remove the base box and inject the chemical anchoring material into the
four holes, then install the base box with the four threaded rods.
•
Wipe the threaded rods clean of excess anchoring resin.
•
Let dry according to the instructions of the chemical anchoring kit.
D
4
7
8
9
6
2
m
m
280 mm
D
8
2
1
6
2
6
0
m
m
192 mm
1
6
0
m
m