5 - Opening the door and trap door

 

 

Strada Evolution 2 - Transfer and Rapide - Installation manual 

10 / 42 

5.2 

Unlocking the access door 

 

 

 

 

 

Unlock  the  flap  that  holds  the 

access door lock. 

 

Lift the access door lock. 

 

 

 

IMPORTANT:

 

After the parking terminal is installed, lower the access door lock to lock 
the door. 

 

 

Open the door with the 
square key. 

  

 

 

Remove the door. 

 

Unfasten and remove the 
four fastening screws (use a 
ratchet handle and a 16-mm 
socket). 

D

8

7

5

6

 

Access door locking flap 

Access door lock 

D

6

3

5

2

 

Screws 

(x4) 

Содержание Strada Transfer

Страница 1: ...Ref 504011588_1 Strada Transfer Rapide Evolution 2 With Strada Evolution 1 fastening kit and anchoring protection plate Installation manual...

Страница 2: ...nt requires the prior written permission of Parkeon Parkeon reserves the right to change data drawings and descriptions without prior notice Certain characteristics may vary according to customer requ...

Страница 3: ...flat ground with base box 22 7 1 Recommendation 22 7 2 Composition of fasteners 22 7 3 Installation on flat ground with base box 1337 mm high 23 7 4 Installation on flat ground with base box 1200 mm...

Страница 4: ...that are in good condition for their intended purpose Mark out the anchoring system in the street while the concrete is setting in order to inform others of the risk of obstruction This may be achiev...

Страница 5: ...ining Only adequately trained personnel may work on the mains power supply Protect personnel from electrical shocks with the help of appropriate electrical and earth connections Always switch off the...

Страница 6: ...buffer batteries or cells Use the appropriate procedures as recommended by the competent health and safety authorities These elements must be disposed of in accordance with local regulations IMPORTANT...

Страница 7: ...lified electrician for the connections and a maintenance agent for the general installation of the terminal These instructions must be followed for optimised terminal installation Please refer to the...

Страница 8: ...round or in an excavation rule spirit level 24 mm eye type spanner ratchet handle 24 mm socket The following are needed for installing the upper part of the terminal ratchet handle 13 mm socket 4 Dime...

Страница 9: ...rminal up to the site on its transport pallet Unpack the terminal Open the housing door IMPORTANT The mechanical lock is protected by guard covers in order to reduce the risk of vandalism Detail A To...

Страница 10: ...holds the access door lock Lift the access door lock IMPORTANT After the parking terminal is installed lower the access door lock to lock the door Open the door with the square key Remove the door Un...

Страница 11: ...ion Parkeon recommends the following concrete base B25 minimum concrete thickness 500 mm 6 2 Composition of fasteners The parts required are Quantity Description Illustration 1 Base box 1 Form 16 or 1...

Страница 12: ...ards EN15291 DDA ADA IMPORTANT Cash from a terminal that is installed so that the final height of user buttons is 1200 mm cannot be collected with a collection trolley The form may be used but is not...

Страница 13: ...tion 2 Transfer and Rapide Installation manual 13 42 IMPORTANT If a form is being used for installation install it in the base box Dig a hole measuring 600 x 600 x 600 mm 500 D6112 100 Top of concrete...

Страница 14: ...of the base box must be flush with the finished ground level Fill the base box with concrete and level it Comply with the drying time recommended by the concrete supplier Carry out the finishing work...

Страница 15: ...rods Set the 4 lower M16 nuts in contact with the housing Check if the housing is vertical If the housing is not perfectly vertical adjust it with the 4 lower nuts or couplings Fasten the 4 upper M16...

Страница 16: ...6 Anchoring in an excavation with a base box Strada Evolution 2 Transfer and Rapide Installation manual 16 42 Installation in accordance with standards EN15291 DDA ADA 1200 mm 752 mm D8764...

Страница 17: ...ing on the position of the base box in the hole the final height of the housing may be adjusted by 96 mm 6 4 1 Preparation Prepare the base box with 8 nuts and 4 anchoring rods protective plate on the...

Страница 18: ...500 mm Set in the base box pushing the anchoring rods into the concrete Fill the base box with concrete fill the base box according to its position in the hole and level it Check that the holes for le...

Страница 19: ...en 4 M16 nuts or 4 couplings on the threaded rods 12 mm above the base box and level them Set the housing on the M16 nuts Place 4 washers and 4 M16 nuts on the anchoring rods Check if the housing is v...

Страница 20: ...tion manual 20 42 Depending on the position of the base box in the ground installation depth the height of the user buttons may thus be 1241 mm with finished ground 1 1300 mm with finished ground 2 or...

Страница 21: ...Excavation installation with base box on sloping ground IMPORTANT Make sure that at least one of the holes for letting water out of the base box is not blocked front of the terminal Draining holes D89...

Страница 22: ...mm the use of chemical anchors of the Spit C Mix Plus make IMPORTANT The chemical anchoring kit is not supplied with the kit for fastening on flat ground with base box 7 2 Composition of fasteners The...

Страница 23: ...ts and 4 anchoring rods following the 104 mm height requirement protective plate on the front of the terminal Check the dimensional requirements of the terminal before anchoring the base box to the gr...

Страница 24: ...drilling operations given below Put the base box in place and check that the bottom of the base box touches the ground Remove the base box and inject the chemical anchoring material into the four hol...

Страница 25: ...ousing on the nuts Place 4 washers and 4 M16 nuts on the threaded rods Check if the housing is vertical If the housing is not perfectly vertical adjust it with the 4 lower nuts or 4 couplings Fasten t...

Страница 26: ...7 Anchoring on flat ground with base box Strada Evolution 2 Transfer and Rapide Installation manual 26 42 889 mm 1337 mm D8939...

Страница 27: ...al that is installed so that the final height of user buttons is 1200 mm cannot be collected with a collection trolley The anchoring protection plate is not used with this installation height 7 4 1 Pr...

Страница 28: ...nsfer and Rapide Installation manual 28 42 IMPORTANT For correct terminal installation the ground must be perfectly horizontal Drill 4 20 holes in the ground following the diagram below 192 x 160 Fron...

Страница 29: ...the base box in place and check that the bottom of the base box touches the ground Remove the base box and inject the chemical anchoring material into the four holes then install the base box with the...

Страница 30: ...o the base box level Set the housing on the base box Place 4 washers and 4 M16 nuts on the threaded rods Set the 4 lower M16 nuts or couplings in contact with the housing Check if the housing is verti...

Страница 31: ...7 Anchoring on flat ground with base box Strada Evolution 2 Transfer and Rapide Installation manual 31 42 Installation in accordance with standards EN15291 DDA ADA 1200 mm 752 mm D8781...

Страница 32: ...minimum drilling depth 250 mm the use of chemical anchors of the Spit C Mix Plus make IMPORTANT The chemical anchoring kit is not supplied with the fastening kit Cash from terminals installed so that...

Страница 33: ...d without base box 8 3 1 Preparation Check the dimensional requirements of the terminal refer to section Dimensions IMPORTANT For correct terminal installation the ground must be perfectly horizontal...

Страница 34: ...above the ground Inject the chemical anchoring material into the 4 holes and install the 4 threaded rods IMPORTANT Protect the threaded rods from surplus anchoring resin to make it easier to fit the n...

Страница 35: ...Set the housing on the threaded rods Place 4 washers and 4 M16 nuts on the anchoring rods Check if the housing is vertical If the housing is not perfectly vertical adjust it with the 4 lower nuts Fas...

Страница 36: ...8 Anchoring on flat ground without base box Strada Evolution 2 Transfer and Rapide Installation manual 36 42 This housing height complies with standards En15291 DDA ADA 1200 mm 752 mm D8784...

Страница 37: ...depending on the ordered options 9 1 Parking terminal alone Use a ratchet handle and a 13 mm socket 9 2 Terminal with integrated solar module and or antenna protection Use a ratchet handle and a 13 mm...

Страница 38: ...e indicator Use a ratchet handle and a 13 mm socket Housing Nut with base Filler screw Waterproofing washers Zone indicator D8813 Antenna Nut with base Housing Zone indicator Integrated solar top and...

Страница 39: ...he upper part of the terminal Strada Evolution 2 Transfer and Rapide Installation manual 39 42 Fitting the solar cable and antenna gland seal Solar cable Housing D8814 1 mm Solar and antenna cable gla...

Страница 40: ...position of the different stickers on a terminal If a card reader is to be installed later on Install a card inlet cover and the black sticker half moon shaped on the lower front The yellow half moon...

Страница 41: ...s Strada Evolution 2 Transfer and Rapide Installation manual 41 42 10 2 Zone marking The drawing below shows the position of the zone marking stickers on a terminal The zone marking sticker is applied...

Страница 42: ...ery Insert the battery and connect it to the main board The battery terminals must be to the back of the housing and the cable is to be placed to the left of the battery so as to not obstruct the uppe...