
15
LT6757 ( Iss 1 06/14 )
P7 Installation Instructions
SECTION EIGHT Siting the Appliance Continued
CHECKING THE FLUE AND FIRE OPENING
Check that the chimney conforms to the required specifications as previously stated. Examine the
condition and carry out any remedial work including removing any debris from the base.
If the flue has been used for solid fuel it should be swept prior to the installation
Prior to installing the appliance a smoke test (using a smoke bomb) should be carried out to check
that satisfactory smoke clearance has been established.
If all the smoke is not drawn into the flue, pre-heat the flue with a blowtorch or similar and re-
check. If there is any uncertainty examine for the cause and, if necessary, seek expert advice.
No combustible material should be fitted inside the fireplace opening.
When installing this appliance against a dry lined (plasterboard) wall ensure that any void
between the plasterboard and the wall is sealed with a suitable
non-combustible material (i.e. plaster or mortar).
GAS SUPPLY ROUTING
Use rigid or semi
– rigid tube to connect the supply. Determine the
gas supply pipe route to the appliance before installing the fire
.
Fixing Firebox Assembly
Slide the firebox into the fireplace open
guiding the gas supply pipe through the hole
at the rear LH bottom of the firebox.
Retain the Firebox using wall plugs and screw
using the four holes within the firebox flange.
Refit the grommet over the pipe and seal
around the inlet hole.
Remove the gas connection cover located
within the burner
The flue outlet hood can now be fitted into the
top of the Firebox assembly and secured
using the M4 nuts provided.
Offer the glass canopy with the side liner cut
outs.
Canopy fixing bracket can now be fitted, secure the bracket using the three M4 studs position
within the fire box top.
Fit the canopy liners LH & RH and secure by bending down the finger folds with the canopy fixing
bracket.
Finally locate the Air tray assembly within the fire box shelf.
Lay the fuel bed as described in section four.
Содержание P7
Страница 23: ...23 LT6757 Iss 1 06 14 ...
Страница 25: ...25 LT6757 Iss 1 06 14 ...
Страница 26: ...26 LT6757 Iss 1 06 14 ...
Страница 27: ...27 LT6757 Iss 1 06 14 ...