5. Testing
8786-A2-GB20-20
February 2001
5-9
Ending an Active Test
Except for the Remote Send Line Loopback, a test initiated by the user can be
ended by the user.
A test initiated by the user can be ended using:
Test Timeout option – Enable the Test Timeout system option so the unit can
automatically terminate tests, and set the Test Duration (min) option to specify
the amount of time that tests can run before the unit terminates the test. The
default is 10 minutes. Refer to
Table A-4, System Options,
in Appendix A,
Configuration Options
.
Command column – Under the Command column on any test screen,
position the cursor at Stop next to the active test and press Enter to stop a
specific test.
Abort All Tests menu selection – Select Abort All Tests from the Test menu
to stop all tests running on all interfaces.
Command
Complete
appears
when all tests on all interfaces have been terminated. Network-initiated
loopbacks cannot be stopped from the Test menu.
An aborted test may continue to run for a few seconds as the Stop command is
sent to the remote end and processed.
Содержание Hotwire 8786
Страница 24: ...2 Using the Asynchronous Terminal Interface 2 10 February 2001 8786 A2 GB20 20...
Страница 52: ...4 Monitoring the Unit 4 16 February 2001 8786 A2 GB20 20...
Страница 62: ...5 Testing 5 10 February 2001 8786 A2 GB20 20...
Страница 68: ...6 Messages and Troubleshooting 6 6 February 2001 8786 A2 GB20 20...
Страница 98: ...B Standards Compliance for SNMP Traps B 6 February 2001 8786 A2 GB20 20...
Страница 100: ...C Connector Pin Assignments C 2 February 2001 8786 A2 GB20 20...
Страница 102: ...D Technical Specifications D 2 February 2001 8786 A2 GB20 20...
Страница 112: ...Index IN 6 February 2001 8786 A2 GB20 20...