![Paradyne Hotwire 7975 Скачать руководство пользователя страница 49](http://html2.mh-extra.com/html/paradyne/hotwire-7975/hotwire-7975_user-manual_3639330049.webp)
Monitoring the Unit
4-5
7975-A2-GB20-40
December 1998
Test Status
The
Test Status messages
in the following table appear in the right column of the
System and Test Status screen.
Table 4-3.
Test Status Messages
Test Status Message
Meaning
No Test Active
No tests are currently running.
LLB Test Active, Pt 1
A network Line Loopback test is active on Port 1.
RLB Test Active, Pt 1
A network Repeater Loopback test is active on Port 1.
DTLB Test Active, Pt 1
A Data Terminal Loopback test is active on Port 1.
DCLB Test Active, Pt 1
A Data Channel Loopback test is active on Port 1.
511 Test Active, Pt 1
A 511 Test and Monitor is active on the DSL Port 1 network
interface.
Lamp Test Active
The Lamp Test is active, causing the LEDs on the front panel to
light.
Содержание Hotwire 7975
Страница 1: ...HOTWIRE 7975 M SDSL STANDALONE TERMINATION UNIT USER S GUIDE Document No 7975 A2 GB20 40 December 1998...
Страница 26: ...Using the Asynchronous Terminal Interface 2 10 7975 A2 GB20 40 December 1998 This page intentionally left blank...
Страница 44: ...Initial Startup and Configuration 3 18 7975 A2 GB20 40 December 1998 This page intentionally left blank...
Страница 98: ...Configuration Option Tables A 18 7975 A2 GB20 40 December 1998 This page intentionally left blank...
Страница 116: ...Technical Specifications D 2 7975 A2 GB20 40 December 1998 This page intentionally left blank...