Testing
5-6
7975-A2-GB20-40
December 1998
Send and Monitor 511
The LTU initiates the test by lighting the Test LED sending a command to the
remote unit to send a 511 test pattern. When the remote unit detects the
command, it sends a 511 pattern and lights the front panel test LED. Each unit
will send and monitor the 511 pattern. The duration and results of the test are
displayed on the Network Test screen of each unit.
NOTE:
The send and monitor test is not a loopback test. Each unit independently
sends and monitors a 511 pattern.
98-15936
NTU/LTU
EIA-530
Port
All 1s
NTU/LTU
Local
Remote
All 1s
511 Pattern
CAP
511
Gen
511
Mon
CAP
511
Mon
511
Gen
Framer
Port
Interface
Framer
Port
Interface
511 Pattern
"
Procedure
To run a Send and Monitor 511 test:
1. Position the cursor at the Start command next to Send and Monitor 511 on
the Network Tests screen.
2. Press Enter.
The Start command is changed to Stop.
3. To manually stop the test, verify that the cursor is positioned at the Stop
command.
4. Press Enter.
When a Send and Monitor 511 test is active, a count of bit errors is displayed next
to the test duration, and the ResetMon virtual function key is available for use.
Type r or R or select the ResetMon virtual function key to reset the error count.
Содержание Hotwire 7975
Страница 1: ...HOTWIRE 7975 M SDSL STANDALONE TERMINATION UNIT USER S GUIDE Document No 7975 A2 GB20 40 December 1998...
Страница 26: ...Using the Asynchronous Terminal Interface 2 10 7975 A2 GB20 40 December 1998 This page intentionally left blank...
Страница 44: ...Initial Startup and Configuration 3 18 7975 A2 GB20 40 December 1998 This page intentionally left blank...
Страница 98: ...Configuration Option Tables A 18 7975 A2 GB20 40 December 1998 This page intentionally left blank...
Страница 116: ...Technical Specifications D 2 7975 A2 GB20 40 December 1998 This page intentionally left blank...