Using the Asynchronous Terminal Interface
2-4
7975-A2-GB20-40
December 1998
The following illustration shows the paths to the different ATI screens.
Main
Status
Test
System and
Test Status
Performance
Statistics
Display
LEDs
Identity
Network
Error
Statistics
Network
Performance
Statistics
Configuration
Control
Factory
Config
Configuration
Loader
Current Configuration
Edit/Display
System
Options
Communication
Protocol Option
Communication
Port
Management
and
Communication
Telnet
Session
SNMP
Traps
Change
Identity
Administer
Logins
Download
Code
Apply
Download
Reset
AutoRate
Network Tests
SYNC Data
Port Tests
Device
Tests
Abort
All
Tests
98-15859
Reset
Device
Network
Sync
Port
Содержание Hotwire 7975
Страница 1: ...HOTWIRE 7975 M SDSL STANDALONE TERMINATION UNIT USER S GUIDE Document No 7975 A2 GB20 40 December 1998...
Страница 26: ...Using the Asynchronous Terminal Interface 2 10 7975 A2 GB20 40 December 1998 This page intentionally left blank...
Страница 44: ...Initial Startup and Configuration 3 18 7975 A2 GB20 40 December 1998 This page intentionally left blank...
Страница 98: ...Configuration Option Tables A 18 7975 A2 GB20 40 December 1998 This page intentionally left blank...
Страница 116: ...Technical Specifications D 2 7975 A2 GB20 40 December 1998 This page intentionally left blank...