2
Worksheets
It is recommended that you complete configuration worksheets before you begin, with
changes from the default (factory-set) settings and information to be entered clearly
marked (e.g., the node’s IP address). Having completed worksheets before installation
is begun speeds setup time.
Worksheets are provided in Appendix B of the
FrameSaver SLV NNI Supplement.
NOTE:
It is important that you follow the instructions for installing the FrameSaver NNI unit
as they are presented if you are to have a quick and trouble-free installation. Do
not install your cables until instructed to do so.
Package Checklist
Verify that your package contains the following:
1-Slot FrameSaver SLV NNI unit
Power cord with desktop 120 Vac power transformer
Universal power supply with an attached cable and ferrite choke
RJ48C (T1) modular cable for U.S. network access (20 feet – 6.1 meters)
FrameSaver SLV 9x24 User’s Guide (Document No. 9024-A2-GB20)
The User’s Guide and the Adobe Acrobat Reader are provided on diskettes. A PC
running Microsoft Windows 3.1 or higher is required to view or print the document.
FrameSaver SLV NNI Supplement (Document No. 9024-A2-GB40)
Warranty card
Training reply card
Additional cables may need to be ordered. See
page 3 when ordering cables.