background image

B. Connectors, Cables, and Pin Assignments

B-4

 

 December 2002

2400-A2-GN20-20

Содержание BitStorm 2461

Страница 1: ...BitStorm 2400 Installation Guide Document No 2400 A2 GN20 20 December 2002...

Страница 2: ...ntative or distributor directly for any help needed For additional information concerning warranty sales service repair installation documentation training distributor locations or Paradyne worldwide...

Страница 3: ...quipment where access can only be gained by service personnel or by users who have been instructed about the reasons for the restrictions applied to the location and about any precautions that must be...

Страница 4: ...t is intended for use in a maximum 50 C ambient temperature in an environment that is free of dust and dirt 13 This product has provisions for the customer to install Class 1 laser transponders which...

Страница 5: ...rrect the interference at his own expense The authority to operate this equipment is conditioned by the requirements that no modifications will be made to the equipment unless the changes or modificat...

Страница 6: ...E December 2002 2400 A2 GN20 20...

Страница 7: ...ack Mount Installation 1 4 Shelf or Desktop Installation 1 5 Installing the Mounting Brackets for Rack Mounting 1 5 Installing the BitStorm 2400 Into a Rack 1 6 Installing the BitStorm 2400 on a Shelf...

Страница 8: ...ng Configuration Files Optional 4 7 Downloading Image Files 4 8 Using FTP to Upload Firmware to the BitStorm 2400 4 9 Setting the Craft Port Configuration 4 10 Changing the Craft Port Password 4 11 Co...

Страница 9: ...ppropriate StormPort DSL modem installation instructions Document Summary Section Description Chapter 1 Installation Provides installation instructions for the BitStorm 2400 Chapter 2 Cabling Contains...

Страница 10: ...er Document Title 2400 A2 GB20 BitStorm 2400 User s Guide Describes how to use the web interface the asynchronous terminal interface and Simple Network Management Protocol SNMP to configure the BitSto...

Страница 11: ...for Bridges 802 1D q RFC 2665 MOs Ethernet like IEEE 802 1D p Priority Queuing RFC 1757 RMON groups 1 2 3 9 RFC 1889 RTP Small Form factor Pluggable SFP Transceiver MultiSource Agreement MSA RFC 2573...

Страница 12: ...About This Guide vi December 2002 2400 A2 GN20 20...

Страница 13: ...king configuration Each unit must be individually administered Set on a shelf or desktop Up to eight BitStorm 2400 units may be stacked on a shelf Power Depending on model the BitStorm 2400 operates o...

Страница 14: ...ht through Interface into processor via 10 100 BaseT CRAFT DB9 plug Null modem crossover cable Interface into processor via RS 232 protocol GigE1 RJ45 Straight through CAT5 E or better Copper First co...

Страница 15: ...is shipped in a cardboard shipping container Carefully remove the unit from its shipping container and check for physical damage If the unit shows signs of shipping damage notify your sales represent...

Страница 16: ...equipment Table 1 2 Contents of Hardware Kit Shipped with the BitStorm 2400 Appearance Description Quantity Self retaining nuts for racks without threaded holes 5 Dress screws 12 24 x 1 2 for use with...

Страница 17: ...ng Brackets for Rack Mounting The right angle mounting brackets have a long side and a short side For 19 inch 483 mm racks the long side of the supplied bracket is fastened to the BitStorm 2400 Proced...

Страница 18: ...les Procedure To install the BitStorm 2400 into a rack 1 Determine where you will mount the BitStorm 2400 in the rack If your rack does not have threaded screw holes slip self retaining nuts onto the...

Страница 19: ...sitions then tighten the bottom screws 02 17243 OK ALARM TEST 1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 47 2 4 6 8 STACK POSITION 1 7 MGMT CONSOLE MODEM ALARM V 35 X 21 UPL...

Страница 20: ...feet in the hardware kit provided with the BitStorm 2400 2 Turn the BitStorm 2400 upside down on a work surface The circles on the bottom of the BitStorm 2400 show the proper positions for the feet 3...

Страница 21: ...s This chapter describes all possible connections not all of which are required Management Port on page 2 2 Craft DCE Null Modem Adapter Interface Port on page 2 3 GigE1 Ports on page 2 4 GigE2 Ports...

Страница 22: ...ed and no user data is accessible over it Procedure To cable the management port 1 Connect an RJ45 straight through cable to the MGMT port 2 Connect the other end to the designated switching equipment...

Страница 23: ...em Adapter Interface port is used to provision the Craft User Interface via a VT100 terminal program Procedure To cable the Craft Interface 1 Connect an RS 232 DB9 cable to the CRAFT port 2 Connect th...

Страница 24: ...r ports are mutually exclusive only one can be in use at a time Procedure To connect the GigE1 fiber port 1 Insert the SFP transceiver in the designated port facing downward Plug the fiber cable into...

Страница 25: ...opper port 1 Insert an RJ45 straight through cable into the designated port to connect to the upstream device switch 2 Connect the other end to the designated switching equipment within your WAN or if...

Страница 26: ...utually exclusive only one can be in use at a time Procedure To connect the GigE2 fiber port 1 Insert the SFP transceiver in the designated port facing downward Plug the fiber cable into the cable soc...

Страница 27: ...02 2 7 Procedure To connect the GigE2 copper port 1 Insert an RJ45 straight through cable into the designated port to connect to the upstream device switch 2 Connect the other end to the GigE1 port of...

Страница 28: ...up to 24 EtherLoop ports over an RJ21X 50 pin cable Procedure To cable the EtherLoop Ports 1 Connect the RJ21X 50 pin cable to the designated port for Lines 1 24 2 Attach the connector hold down stra...

Страница 29: ...source 1 Insert the power cord into the designated socket on the back of the unit 2 If the BitStorm 2400 is in a rack dress the power cord to the left and fasten it to the rail with a cable tie 3 Con...

Страница 30: ...d 1 Strip back the insulation approximately 5 16 of an inch 8 mm on 14 AWG copper ground wire 2 Loosen the screw on the grounding lug located on the back of the unit 3 Insert the stripped end of the w...

Страница 31: ...r 60 VDC power to the BitStorm 2400 from a single power source 1 Strip the tips of the power source wires about 1 2 inch or 12 7 mm in length before inserting the wire into the 2 position plug The 2 p...

Страница 32: ...in a rack dress the power cable to the left and fasten it to the rail with a cable tie 6 Turn on power to the power cable Make sure the STATUS LED on the front panel is ON green Insert the Into the Ne...

Страница 33: ...ember 2002 3 1 3 LEDs LED Locations The following illustrations show the locations of the front panel LEDs Figure 3 1 BitStorm 2400 Front Panel Right Side Figure 3 2 BitStorm 2400 Front Panel Left Sid...

Страница 34: ...g valid Ethernet timing from the connected source Red On Unit has failed self test will not attempt to train up Notify your service representative Amber TX RX Flashes to indicate data is being transmi...

Страница 35: ...obtained via the terminal interface configuration The IP address is then used to access the web interface CAUTION Assigning IP addresses through both the Out of Band MGMT and In Band via GigE and CRAF...

Страница 36: ...roceed through the parameters Stop at the other field where the MAC address is displayed Note the MAC address then continue proceeding through the parameters In the event you inadvertently delete the...

Страница 37: ...ing If the string is entered without commas routing from the out of band port will not work 8 Enter p once again at the prompt to view parameters 9 Type at the prompt to boot NOTE The HELP command wil...

Страница 38: ...the PC laptop Connect the CRAFT port of the BitStorm 2400 to the serial port of the PC laptop with a DB9 cable 2 The following prompt is displayed on the terminal Password ____________ The BitStorm 2...

Страница 39: ...must be set prior to remote management Procedure To configure the BitStorm 2400 Switch 1 Select Switch Configuration from the Main Menu then press Enter 2 Use decimal dot format to enter the IP Addres...

Страница 40: ...ed fields may be enabled or disabled This is an optional feature Procedure To set port statistics 1 Select Port Statistics from the Main Menu then press Enter 2 Highlight the State field Use the arrow...

Страница 41: ...Select Configuration File Upload Download from the Main Menu then press Enter 2 Enter the filename of the configuration file in the Image Path field this is assumed to be in the tftpboot directory unl...

Страница 42: ...ave the StormTracker EMS software Procedure To download image files 1 Select Image File Download from the Main Menu then press Enter 2 Enter the file name vxWorks or vxWorks Z in the Image Path field...

Страница 43: ...and prompt and initiate an FTP session with the unit For example ftp 137 35 12 126 3 When FTP requests a login name and password press Enter without typing any text 4 Set the file type to binary bin 5...

Страница 44: ...from the Main Menu then press Enter 2 Use the arrow keys to select a Baud Rate The default and recommended value is 19200 3 Select SAVE then press Enter when finished The boot code always uses a baud...

Страница 45: ...Password The password is a maximum of 16 case sensitive characters Procedure To change password 1 Select Change Password from the Main Menu then press Enter 2 Enter the new password then re type the p...

Страница 46: ...set training and perform diagnostic testing in the StormPort modems attached to your network Highlight the designation option then press Enter to proceed The second screen in the EtherLoop Configurati...

Страница 47: ...ss the spacebar to toggle the mode Once training modes are set you may proceed to Diagnostic Testing However this is an advanced development option and is used to change ATE passwords and to perform A...

Страница 48: ...4 Configuration 4 14 December 2002 2400 A2 GN20 20...

Страница 49: ...ing table displays each option and the interface with which it can be accessed See the BitStorm 2400 User s Guide for option details Table A 1 Interface Management Options 1 of 5 Function Terminal Web...

Страница 50: ...System System Description X X System Object ID X X Num Network Interfaces X X System Up Time X X System Name X X System Location X X System Contact X X Product Name X X Port Statistics Unit X X X Por...

Страница 51: ...tion Baud Rate X X Character Size X X X Flow Control X X X Parity X X X Stop Bits X X X Change Password New Password X Retype Password X Notification Traps Targets Addresses Parameters X Notifications...

Страница 52: ...ate Time X 1 8 X 9 16 X 17 24 X 25 26 X VLAN Multicast Static VLANs Unit X X VID X X Name X X Secure X 1 8 X X 9 16 X X 17 24 X X 25 26 X X Status Box VLAN Multicast GVRP Ports Unit X Port X Priority...

Страница 53: ...ast Static Multicast Groups VID X MAC Address X X 1 8 X X 9 16 X X 17 24 X X 25 26 X X Status Box X VLAN Multicast GARP GMRP Ports Unit X Port X Join Time X Leave Time X Leave All Time X Ingress Filte...

Страница 54: ...A Interface Management A 6 December 2002 2400 A2 GN20 20...

Страница 55: ...ing MGMT RJ45 Straight through Interface into processor via 10 100 BT CRAFT DB9 plug Null modem crossover cable Interface into processor via RS 232 protocol GigE1 10 100 1000BaseT RJ45 Straight throug...

Страница 56: ...user interface GigE1 2 Connectors The GigE1 and GigE2 copper connectors are 8 pin modular jacks for 10 100 1000BaseT Table B 2 Management Port Pinouts Pin Signal 1 Transmitted Data 2 Transmitted Data...

Страница 57: ...rLoop Network Interface Cable The 50 pin RJ21X Telco connector provides the 2 wire loop interface from each EtherLoop port to the demarcation point The following table lists the pinout assignments 02...

Страница 58: ...B Connectors Cables and Pin Assignments B 4 December 2002 2400 A2 GN20 20...

Страница 59: ...BitStorm 2400 AC Power Includes BitStorm 2400 power cord mounting brackets hardware kit ferrite choke and Installation Guide 2461 A1 420 BitStorm 2400 DC Power Includes BitStorm 2400 mounting bracket...

Страница 60: ...C Equipment List C 2 December 2002 2400 A2 GN20 20...

Страница 61: ...ns and does not rely on vertical air flow Electrical Safety Meets the following standards UL 60950 3rd Edition CSA C22 2 No 60950 00 3rd Edition EN 60950 2000 ICE 950 with amendments A1 A2 A3 A4 throu...

Страница 62: ...o 158 F Altitude Up to 13 125 ft 4 000 m Shock and vibration tolerance sufficient to withstand normal shipping Physical Dimensions Height 1 75 44 45 mm or 1U as defined in EIA 310 C without feet Width...

Страница 63: ...Loop Network Interface B 3 management port B 2 cooling D 1 Craft interface pin assignments B 2 port cabling 2 3 used for configuration 4 1 D DC power connecting 2 11 specifications D 2 desktop install...

Страница 64: ...Out of Band management 2 2 P package contents 1 3 password 4 11 pin assignments B 2 pinouts B 2 Port Statistics 4 6 ports D 2 power connection AC 2 9 DC 2 11 power consumption D 2 power cord 2 9 punch...

Отзывы: