5
Step 9): Setting the Vertical Poles into the Top-Rail: (Mount top frame to
stand pipes)
With all top frame connections complete, get the help of one or more people
to lift each side and lower the top pipe holes (under the top pipes) over each
stand pipes
FIG.5