Page ‑ 16
Manual | English
Step 1 – Setting-up the tripod
Each tripod leg has to be set up in the same height
and then the tripod with tense distance wires has to be
erected steady on the plane ground. An uneven floor can
be levelled by turning the levelling sleeves.
WARNING !
Load‑carrying capacity of the under‑
ground: min. 1200 kg/m², Slope: max.
1%
Components needed:
1 x
PIXY Tripod
138892
Step 2 - Setting-on the central section
Put the central pivot section on the tripod and screw it
tight. The central section can be put in balance precisely
with blue levelling sleeves on the tripod.
Components needed:
1 x
Central pivot section PIXY
143788
7.3
Installation instructions versions 2-7
Please follow the instructions below to install the PIXY Crane System version 7.
NOTE !
Versions 2‑6 can be installed in the same way. Just accordingly less number
of outriggers and bracing wires shall be installed at the front side (remote
mount).
Содержание PIXY Series