Warning:

 Hose lengths depend on the data center’s overhead plenum configuration. The 

low-pressure hose is usually shorter than the high-pressure hose. 

17

Overhead Plenum Installation

Perform the following activities to install a Pressure Node in an overhead plenum.

1.  Prepare diffuser hose and plenum.

a.  Determine Pressure Node installation location on the wall near the overhead plenum.
b.  Remove plenum cover.
c.  Clean area where Pressure Node will reside with alcohol wipes. Allow area to dry thoroughly.
d.  Determine necessary lengths for the low- and high-pressure hoses, using one-third/two-thirds

ratio (60” hose cut to 20” and 40” lengths) with the low-pressure hose usually shorter than the
high-pressure hose.

Warning:

 Hose lengths depend on the data center’s overhead plenum configuration. The

ow-pressure hose is usually shorter than the high-pressure hose.

e.  Cut diffuser hose into required

lengths using scissors or a
utility knife.

f. 

Using gentle but firm
pressure, attach hoses to the
appropriate inlets on the
Pressure Node.

2.  Activate, position, and secure the Pressure Node.

a.  Once  hoses  are  connected,  activate  Pressure  Node  by

inserting a thin blade screwdriver into the recessed slot of the
node and slide the switch to the 

ON

 position.

b.  Ensure  Pressure  Node  is  active.  Light  Emitting  Diodes

(LEDs) on the Pressure Node will blink during activation. Full
activation  sequence  lasts  from  10  minutes  to  over  an  hour
depending on the network environment.

c.  Attach 3M Command Strips to the underside of the Pressure

Node (if not already present). Remove adhesive covers from
3M Command Strips.

d.  Install Pressure Node to the wall/ceiling and press firmly for

30 seconds to ensure a secure bond.

PRESSURE NODE INSTALLATION MANUAL

Содержание SynapSense Pressure Node

Страница 1: ...Pressure Node Installation Manual Release 7 4 1 Issue 1...

Страница 2: ...Process Flow 10 Preparing to Install the Pressure Node Hardware 11 Pressure Node Placement 11 Installing Pressure Node Kits 12 Cabinet Floor to Subfloor 13 Overhead Plenum Installation 13 Cabinet and...

Страница 3: ...ng System Commissioning Form 27 FRM 007 Environmental Monitoring System 27 Appendix C Technical Support and Return Material Authorization 35 Panduit Technical Support 35 Opening a Technical Support Ca...

Страница 4: ...ed with diffusers Each diffuser resides in a location to measure the air pressure differential between the room and the subfloor or overhead plenums Once installed and operational the node transmits a...

Страница 5: ...ference Table 1 Chapter and Appendices Summary Chapter Description Introduction Introduces the Pressure Node describes this guide and lists Warnings and Precautions Getting Started Lists the hardware...

Страница 6: ...e interference at his own expense This device complies with Part 15 of the FCC Rules Operation is subject to the following two conditions 1 this device may not cause harmful interference and 2 this de...

Страница 7: ...terference 2 This device must accept any interference including interference that may cause undesired operation of the device Ce dispositif contient les metteurs r cepteurs autoriser exempts qui sont...

Страница 8: ...is equipment must be in accordance with local and national electrical codes Safety Warning This product contains Lithium metal primary cell batteries which are NOT rechargeable Recharging can cause ba...

Страница 9: ...still air Rapidly moving air provides incorrect pressure readings Keep diffuser at least one foot away from server fan airflow holes in the subfloor or perforated floor tiles PLACE HIGH PRESSURE DIFFU...

Страница 10: ...forming work in a data center including areas Attire inside the sub floor and above ceiling tiles Ladder Step Stool To access all areas of the CRAC CRAH units Additional Parts Spare ThermaNodes and ba...

Страница 11: ...rea to dry Ensure no tripping or other data center wiring hazards result from Pressure Node installation Adhere to safety regulations Inform customer when relocating nodes to ensure compliance with si...

Страница 12: ...nal materials to complete installation and site is ready for installation For Pressure Nodes with MAC IDs not yet recorded or scanned follow these steps a Record the Pressure Node MAC IDs manually or...

Страница 13: ...Validating and Commissioning the Pressure Node Installation to validate the installation and commission pressure nodes See Inspecting the Installation to complete the installation In all configuration...

Страница 14: ...ured to the stanchion with a plenum rated zip tie Overhead Plenum Installation In the diagram below the Pressure Node mounts on the wall with one hose diffuser inserted through a hole in the ceiling a...

Страница 15: ...3 ft maximum Otherwise cut to fit hose c Cut diffuser hose using scissors or utility knife d Attach short hose to the low pressure inlet using gentle but firm pressure e Remove tile to the subfloor c...

Страница 16: ...inserting a thin blade screwdriver into the recessed slot of the node and slide the switch to the ON position b Ensure the Pressure Node is active Light Emitting Diodes LEDs on the Pressure Node will...

Страница 17: ...hose routing is under existing wires and cables to prevent inadvertent disconnection 5 If needed secure short hose diffuser with cable clip to prevent hose from moving freely 6 Remove tools and debri...

Страница 18: ...head plenum configuration The ow pressure hose is usually shorter than the high pressure hose e Cut diffuser hose into required lengths using scissors or a utility knife f Using gentle but firm pressu...

Страница 19: ...tion as pressure reading will not be accurate b Remove adhesive cover on a cable clip and install inside the plenum duct near the long hose c Secure long hose to cable clip d Secure short hose if dang...

Страница 20: ...et the MapSense user level to Expert 4 Locate the old Pressure Node 2 in the MapSense project 5 Update MAC ID to the one associated with new pressure 3 node 6 Right click the node and select Replace C...

Страница 21: ...Console and select the data center from the Sites list b Click the Data View tab c Select Nodes from the Data View drop down menu A tabular view of the Cabinet Node data displays 2 Verify green check...

Страница 22: ...slucent plastic cover on the topside corner of the case The following diagram shows the typical color sequences displayed as the node powers on and joins a wireless network Typically the sequence from...

Страница 23: ...22 PRESSURE NODE INSTALLATION MANUAL...

Страница 24: ...m below explains the typical sequence of colors displayed when the Pressure Node 3 first activates and connects to the appropriate wireless network NOTE In a high noise environment the LED toggles bet...

Страница 25: ...are positioned consistently b Diffuser placement above floor and subfloor as needed c Zip ties and clips do not interfere with fans or bind or rub against surfaces 2 Clear the installation area a Rem...

Страница 26: ...lastic cover using a small screwdriver to pry it open 3 Replace the batteries four for Pressure Node 2 two for Pressure Node 3 with Energizer L91 Lithium Iron Disulfide AA or equivalent for battery co...

Страница 27: ...se steps 1 Carefully slice the hose lengthwise from the inlet connection using a utility knife 2 Peel and remove the hose from the inlet connection 3 Clean any debris from the inlet 4 Attach new diffu...

Страница 28: ...er Customer PO Number Customer Name Site Name Site Address Contacts Name Phone Number Email Address Customer Main Contact System Owner Contact Customer PM SynapSense PM Environmental Monitoring Commis...

Страница 29: ...stomer Customer Rep Site Network Information Name Building Rac k Location IP Address Software Firmware Ver Login username password 01 Environmental Server 02 Switch 03 Desktop PC 04 Laptop 05 Wireless...

Страница 30: ...Hum 02 Gateway 03 Pressure2 Assemblies 04 Rear Node Assemblies 05 Vertical LI String 06 SynapSense Server Total WSN Nodes Environmental Server Specifications Operating System Version type Processor RA...

Страница 31: ...e Information documented 04 Environmental Server PC configured to local time PRESSURE NODE INSTALLATION MANUAL MySQL Install Drive MySQL Backup Drive MySQL Port LiveImaging Install Drive Device Manage...

Страница 32: ...object types match installed node configurations 13 MapSense object locations correspond to floor space locations Server Rack ThermaNodes 14 Verify cabinet doors open close without pulling wiring har...

Страница 33: ...ssure areas 24 Verify hose routing low pressure hose route to side of server or outside plenum duct avoiding rapid airflow high pressure hose route to sub floor or inside plenum duct 25 Secure pressur...

Страница 34: ...hecklist Checklist Item Description Notes 35 Run Support Dump 36 Copy last DL file 37 Attach WSN Screen Shot Notes RMA Sensor Name Part No Serial No MAC ID Type 01 02 03 04 05 06 07 08 09 10 11 12 13...

Страница 35: ...34 Environmental Monitoring Commissioning Checklist Checklist Item Description Notes 17 18 19 20 PRESSURE NODE INSTALLATION MANUAL...

Страница 36: ...pport Login at the top of the page a Login using your email and password b Search the knowledgebase for the symptom If the knowledgebase solution does not resolve the issue enter a Technical Support C...

Страница 37: ...returned for root cause analysis When it is necessary to return a damaged or defective product a Return Material Authorization RMA is required Returns are only accepted with an accompanying RMA number...

Страница 38: ...some subsequent action moved redeployed SMOTA etc e Part number underside of most nodes f Serial number underside of most nodes typically beginning with PR or AM g MAC ID on the exposed barcode label...

Отзывы: