DP
O
E™
Power System User Manual
Part Number: PN380C
7
Torque Settings
The following table shows recommended torque settings for all mechanical and electrical connections
according to screw or nut size in inch pounds (in-lbs).
Table 6: Recommended Torque Settings
Screw or Nut Size
Toque (in-lbs)
4-40 6
6-32 12
8-32 22
10-32 37
12-24 50
¼-20 65
Required Tools
The
DP
O
E™
Power System is designed to be installed with commonly available tools:
•
#1 & #2 flat blade and Phillips head screwdrivers
•
Torque wrench
•
7/16” socket, ¼” drive
•
Wire and cable strippers (
PANDUIT
part number CT-100)
•
Wire and cable crimpers (such as
PANDUIT
part CT-1550, CT-1551, CT-1570, CT-1700
Contour Crimp
TM
Controlled Cycle Crimp Tools) (used for optional bulk DC connection)
•
Site and Equipment Preparation
Prior to unpacking the
DP
O
E™
Power System, note any physical package damage that could indicate
potential damage to the contents. After removing the
DP
O
E™
Power System from the boxes and packing
material, inspect for shipping and/or other damage. Any problems should be reported to
PANDUIT
technical support.
Table 7:
PANDUIT
Corp. Contact Information
PANDUIT
Technical Support
Fax:
1-708-444-6993
E-mail: [email protected]
PANDUIT
Product Installation Instructions
www.panduit.com/resources/install_maintain.asp
Worldwide Subsidiaries and Sales Offices
www.panduit.com
Have all tools, wire, cables, hardware, etc., within easy reach. To the extent possible, ensure a clean
(free of debris, dust, foreign material, etc.) work environment. Care should be taken in the installation
process to prevent wire clippings from getting into the equipment.
NOTE:
If possible, the rectifiers should remained sealed in their shipping boxes until the
chassis wiring is complete. Rectifiers should not be inserted until all
DP
O
E™
components are properly connected.