User Manual For Cyclone LC Programmers
63
7
CYCLONE PROGRAMMER MANUAL CONTROL
The
Cyclone LC
must be configured before it can serve as a Stand-Alone Programmer. The user
may manually control the Cyclone via the LCD touchscreen menu and/or the Start button, or via
PC software. See
CHAPTER 8 - CYCLONE PROGRAMMER AUTOMATED CONTROL
for information on how to use the Cyclone Control Suite to
configure, control, and automate Cyclone operations. The target power management schemes
remain the same for each control method.
7.1
Operation Via Start Button
There is a Start button on the top of the Cyclone which is used for stand-alone programming. It is
specified as follows.
Button
Function
START
Start executing the tasks pre-configured into the Cyclone of the currently
selected programming image.
7.1.1
LED Indicators
The Cyclone has two (2) LEDs to indicate the current operation stage.
LED
FUNCTION
Error
The Cyclone failed to execute the functions as instructed.
Success
The Cyclone executed the functions successfully.
7.1.2
Procedure via Start Button / LEDs
The following steps must be followed in order for the Cyclone to operate properly after it has been
configured:
1. Turn off the target power supply if the “POWER IN” Jack is adopted.
2. Turn off the Cyclone system power.
3. Set the correct Power Management jumper settings.
4. Connect the target power supply to the “POWER IN” Jack, if applicable.
5. Connect the “POWER OUT” Jack to the target board power, if applicable.
6. Connect the ribbon cable to the target board debug connector.
7. Turn on the Cyclone system power.
8. Turn on the target power supply, if applicable.
9. Press the “START” button on the Cyclone.
When the “Success” LED lights up, you have successfully programmed your target.
7.1.3
Example
After the user programs the contents and procedures into the Cyclone’s on-board flash, the
Cyclone may be used as a Stand-Alone Programmer. Suppose the user wants to perform the
following instructions for a target device:
1) Erase Module
2) Program Module
3) Verify Module.
If the Cyclone is providing power to the target board, the “Target Power” icon will illuminate on the
LCD display.
The Cyclone will then perform the operations. If they are performed successfully, the “Success”
LED will be illuminated. One stand-alone programming cycle will have just been completed.
Содержание Cyclone LC Series
Страница 1: ...Cyclone LC Programmers User Manual...
Страница 8: ...17 6 Debug Ports CYCLONE LC UNIV 149 17 7 International Shipping 149 17 8 Compliances Standards 149...
Страница 41: ...User Manual For Cyclone LC Programmers 41 Figure 5 2 Main Menu Structure...
Страница 134: ...User Manual For Cyclone LC Programmers 134 4 Click the Add New License button Figure 13 2 Add New License Button...