7.4.

General

Up to 3 units can be connected by crossover power source
wiring between outdoor units. However, units of smaller capacity
must be connected downstream. For details, refer to the
equipment design data and technical data.

When connecting several units in Urban Multi  combination, the
power supply of each outdoor unit can also be connected
separately. Refer to the field wiring on the engineering data book
for further details.

Make sure to connect the power source wire to the power source
terminal block and to clamp it as shown in 

figure 10

, chapter

“Field line connection”.

As this unit is equipped with an inverter, installing a phase
advancing capacitor not only will deteriorate power factor
improvement effect, but also may cause capacitor abnormal
heating accident due to high-frequency waves. Therefore, never
install a phase advancing capacitor.

Keep power imbalance within 2% of the supply rating.

Large imbalance will shorten the life of the smoothing capacitor.

As a protective measure, the product will stop operating and an
error indication will be made, when power imbalance exceeds 4%
of the supply rating.

Follow the “electrical wiring diagram” when carrying out any
electrical wiring.

Only proceed with wiring work after blocking off all power.

Always ground wires. (In accordance with national regulations of
the pertinent country.)

Do not connect the ground wire to gas pipes, sewage pipes,
lightning rods, or telephone ground wires.

Combustion gas pipes: can explode or catch fire if there is a gas
leak.

Sewage pipes: no grounding effect is possible if hard plastic
piping is used.

Telephone ground wires and lightning rods: dangerous when
struck by lightning due to abnormal rise in electrical potential in
the grounding.

This unit uses an inverter, and therefore generates noise, which
will have to be reduced to avoid interfering with other devices.
The outer casing of the product may take on an electrical charge
due to leaked electrical current, which will have to be discharged
with the grounding.

Be sure to install an earth leak detector. (One that can handle
higher harmonics.)
(This unit uses an inverter, which means that an earth leak
detector capable of handling high harmonics needs to be used
in order to prevent malfunctioning of the earth leak detector
itself.)

Earth leak detector which are especially for protecting ground-
faults should be used in conjunction with main switch or fuse for
use with wiring.

This unit has a negative phase protection circuit. (If it operates,
only operate the unit after correcting the wiring.)

7.5.

Examples

System example 

(See figure 11)

Field line connection

L1, L2, L3, N-phase of the power cord should be clamped to the
plastic bracket using field supplied clamp material.

The green and yellow striped wrapped wires should be used for
grounding. 

(See figure 10)

(See figure 21)

1

Field power supply

2

Main switch

3

Earth leak detector

4

Fuse

5

Cool/heat selector

6

Remote controller

Power supply wiring (sheathed cable)

Transmission wiring (sheathed cable)

1

Power supply (400 V, Three-phase)

2

Fuse

3

Grounding wire

4

Earth leak detector

5

Attach insulation sleeves

6

Power supply terminal block

7

Ground wire

8

Clamp the ground wires along with the power wires using field supplied 
clamps.

9

Clamp each power wire separately to the plastic brackets using field 
supplied clamps.

10

When wiring, do not allow the ground wires to contact the compressor 
lead wires. If the wires contact each other, adverse effects may occur 
to other units.

11

When connecting two wires to one terminal, ensure that the crimp-style 
terminals face with each other back to back.
Moreover, make sure that the wire of the smaller gauge is located 
above.

12

Crimp-style terminal

13

Wire gauge: Small

14

Wire gauge: Large

15

Plastic bracket

1

Electric wiring

2

Wiring between units

3

Clamp to the electric box with field supplied clamps.

4

When routing out the power/ground wires from the right side:

5

When routing the remote control cord and inter-unit wiring, secure 
clearance of 50 mm or more from the power wiring. Ensure that the power 
wiring does not contact any heated sections ( 

 ).

6

Clamp to the back of the column support with field supplied clamps.

7

When routing out the inter-unit wirings from the opening for piping:

8

When routing out the power/ground wires from the front:

9

When routing out the ground wires from the left side:

10

Grounding wire

11

When wiring, pay attention not to detach the acoustic insulators from the 
compressor.

12

Power supply

13

Fuse

14

Earth leakage breaker

15

Ground wire

16

Unit A

17

Unit B

18

Unit C

Содержание U-5MX3XPQ

Страница 1: ...14MX3XPQ A U 16MX3XPQ A U 18MX3XPQ U 20MX3XPQ U 22MX3XPQ U 24MX3XPQ U 26MX3XPQ U 28MX3XPQ U 30MX3XPQ U 32MX3XPQ U 34MX3XPQ U 36MX3XPQ U 38MX3XPQ U 40MX3XPQ U 42MX3XPQ U 44MX3XPQ U 46MX3XPQ U 48MX3XPQ...

Страница 2: ...D c H h h1 h2 1500 1 3 5 4 2 2 mm 6 3 1 0 0 0 1 0 0 0 1000 1 50 0 1500 1500 722 737 80 80 765 A B 1 2 4 5 6 7 3 7 1 6 1 2 4 5 3 5 3 3 2 1 5 3 3 1 3 3 4 4 4 4 9 4 4 5 7 7 5 5 2 5 5 5 5 6 2 6 9 2 2 6 6...

Страница 3: ...4 5 6 7 17 8 12 20 18 18 1 2 1 2 5 3 3 3 3 5 5 5 7 5 4 4 4 4 4 6 A B F2 F2 F1 F1 A B C Q1Q2 1 4 3 2 2 6 6 6 5 1 2 3 3 4 4 5 6 3 4 3 4 6 3 4 6 F2 F1 F2 F1 F2 F1 F2 F1 F2 F1 2 1 A B C A B C F1 F2 F1 F2...

Страница 4: ...16 17 18 5 1 7 10 3 2 9 6 6 6 6 7 4 11 8 6 6 6 6 6 6 7 7 9 8 4 11 6 6 1 10 3 2 6 6 6 6 18 TO IN D UNIT F1 F2 DS1 1 2 3 4 OFF ON O U T I N F1 F2 F1 F2 F1 F2 1 A B C A B C 1 DS1 1 2 3 4 OFF ON O U T I N...

Страница 5: ...0A refer to the product catalogs Total capacity quantity of indoor units U 5 48MX3 Urban Multi air conditioner Installation manual READ THIS MANUAL ATTENTIVELY BEFORE STARTING UP THE UNIT DO NOT THROW...

Страница 6: ...fer to figure 1 and choose one of the possibilities In case of an installation site where only the sides A B have obstacles the wall heights have no influence on any indicated service space dimensions...

Страница 7: ...uipment personal computers etc See figure 2 In extreme circumstances you should keep distances of 3 m or more and use conduit tubes for power and transmission lines In heavy snowfall areas select an i...

Страница 8: ...frigerant All field piping must be installed by a licensed refrigeration technician and must comply with relevant local and national regulations CAUTION TO BE TAKEN WHEN BRAZING REFRIGERANT PIPING Do...

Страница 9: ...recommended pipe size is not available stick to the original pipe diameter which may result in a small capacity decrease Cautions for installation of multiple outdoor units 1 The piping between the o...

Страница 10: ...e outdoor unit connecting pipe kits or between the outdoor units exceeds 2 m create a rise of 200 mm or more in the gas line within a length of 2 m from the kit If 2 m If 2 m A Unit A B Unit B C Unit...

Страница 11: ...t 8 i 40 m Refrigerant branch kit selection Refrigerant branch kits can only be used with R 410A How to select the line branch pipe When using line branch pipe at the first branch counted from the out...

Страница 12: ...unit is U 34MX3 and the piping lengths are as below R 30x0 25 10x0 17 10x0 11 40x0 054 49x0 022 6 7 538 R 7 5 kg A B C D Outdoor unit capacity type Piping size outer diameter Gas pipe Liquid pipe U 5...

Страница 13: ...backseat type Always use the special tool 3 Make sure to tighten the cap securely Closing stop valve 1 Remove the cap and turn the valve clockwise with the hexagon wrench 2 Securely tighten the valve...

Страница 14: ...e additional refrigerant to be charged on page 8 and fill in the amount in the Additional refrigerant charge label attached to the unit After the vacuum drying is finished charge the additional refrig...

Страница 15: ...oor unit installed See figure 9 1 Fully open the gas line stop valve oil equalizing line stop valve liquid line stop valve and valves A and B above must be left fully closed start the additional refri...

Страница 16: ...ection wiring to outdoor outdoor transmission F1 F2 outdoor indoor transmission F1 F2 outdoor multi transmission Q1 Q2 refer to 7 5 Examples on page 13 For connection wiring to the central remote cont...

Страница 17: ...n earth leak detector capable of handling high harmonics needs to be used in order to prevent malfunctioning of the earth leak detector itself Earth leak detector which are especially for protecting g...

Страница 18: ...torque for the terminal screws Precautions when connecting the ground When pulling the ground wire out wire it so that it comes through the cut out section of the cup washer An improper ground connect...

Страница 19: ...The interconnecting wiring between the outdoor units must be 30 m See the paragraph Fixing field line connection on page 14 A Electric wiring diagram Printed on the back of the electric box lid 1 Cut...

Страница 20: ...y For that purpose perform normal operation using the remote controller after the check operation Make sure that the circuit breaker on the power supply panel of the installation is switched off Attac...

Страница 21: ...entration level is required According to the appropriate European Standard the maximum allowed concentration level of refrigerant to a humanly space for R 410A is limited to 0 44 kg m3 Pay special att...

Страница 22: ...of the maximum concentration level then it will be necessary to revise the system Please consult your supplier NOTES amount of refrigerant in a single unit system amount of refrigerant with which the...

Страница 23: ...NOTES NOTES...

Страница 24: ...4PWEN16235 1C...

Отзывы: