Step 1
Install the belt temporarily.
NOTE:
Take care not apply the grease to the belt.
Step 2
Upset the CD loading unit.
Step 3
Remove 3 screws.
Step 4
Unsolder the plunger terminals (2 points).
Step 5
Unsolder the motor terminals (2 points).
Step 14
Install the tray base, traverse ass’y, mechanism cover
and upper plate.
[Operation check after servicing]
Check the proper operation of following items with gear and
hexagonal screwdriver.
1. Open/close of tray base.
2. Moving the tray base to the stock side.
3. UP/DOWN operation of spindle base unit.
4. UP/DOWN operation of traverse ass’y.
Step 6
Release the 2 claws (A), and then remove the Motor
P.C.B.
Step 7
Release the claw (B), and then remove the motor ass’y.
[Notice for motor ass’y installation]
1. Locate the name plate of motor to the traverse ass’y.
2. Align the hole of motor with the ribs.
9.12.4. Replacement for the motor ass’y
31
SA-AK330GC / SA-AK330GN
Содержание SA-AK330GC
Страница 9: ...8 Operation Procedures 9 SA AK330GC SA AK330GN ...
Страница 10: ...10 SA AK330GC SA AK330GN ...
Страница 55: ...15 Voltage Measurement 55 SA AK330GC SA AK330GN ...
Страница 56: ...56 SA AK330GC SA AK330GN ...
Страница 87: ...21 Troubleshooting Guide 87 SA AK330GC SA AK330GN ...
Страница 89: ...22 1 Deck Mechanism RAA4502 S 22 1 1 Deck Mechanism Parts Location 89 SA AK330GC SA AK330GN ...
Страница 90: ...90 SA AK330GC SA AK330GN ...
Страница 92: ...22 2 CD Loading Mechanism RD DAC026 S 22 2 1 CD Loading Mechanism Parts Location 92 SA AK330GC SA AK330GN ...
Страница 93: ...93 SA AK330GC SA AK330GN ...
Страница 95: ...22 3 1 Cabinet Parts Location 22 3 Cabinet 95 SA AK330GC SA AK330GN ...
Страница 96: ...96 SA AK330GC SA AK330GN ...
Страница 106: ...22 6 Packaging 106 SA AK330GC SA AK330GN PRT0411 P S J N A E ...