manualshive.com logo in svg
background image

ND-71075 (E)

ISSUE 1

STOCK # 152015

Retrofit System Guide

includes NEAX

®

1000 IVS

JUNE, 2000

NEC America, Inc.

®

Содержание NEAX 2000IVS2

Страница 1: ...ND 71075 E ISSUE 1 STOCK 152015 Retrofit System Guide includes NEAX 1000 IVS JUNE 2000 NECAmerica Inc...

Страница 2: ...pared this document for use by its employees and customers The information contained herein is the property of NEC America Inc and shall not be reproduced without prior written approval from NEC Ameri...

Страница 3: ...DATE DATE NEAX2000 IVS Retrofit System Guide Revision Sheet 1 1 ND 71075 E PAGE No ISSUE No 1 2 3 4 5 6 7 8 i 1 ii 1 iii 1 iv 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 1...

Страница 4: ...ant Console 8 Maintenance Administration Terminal MAT 9 Customer Administration Terminal CAT 9 Registers 9 CHAPTER 2 INSTALLATION 11 PRECAUTIONS 12 Static Electricity Guard 12 INSTALLATION PROCEDURE 1...

Страница 5: ...NEAX2000 IVS Retrofit System Guide Page ii ND 71075 E Issue 1 0 LIST OF FIGURES Figure Title Page Figure 2 1 Static Electricity Guard 1 of 2 12 Figure 2 1 Static Electricity Guard 2 of 2 13...

Страница 6: ...OF TABLES Table Title Page NEAX2000 IVS Retrofit System Guide ND 71075 E Issue 1 0 Page iii Table 1 1 Required Hardware Software 4 Table 1 2 System Capacity 5 Table 2 1 List of Retrofit Control Cards...

Страница 7: ...guide contains the following chapters CHAPTER 1 GENERAL INFORMATION This chapter explains the hardware software requirements system capacity and system conditions for the retrofit system CHAPTER 2 INS...

Страница 8: ...rmer system NEAX2000 IVS Small Platform System Manual Describes the installation procedure of the Small Platform System NEAX1000 IVS Very Small Platform System Manual Describes the installation proced...

Страница 9: ...00 IVS Retrofit System Guide ND 71075 E Issue 1 0 Page 3 CHAPTER 1 GENERAL INFORMATION This chapter explains the hardware software requirements system capacity and system conditions for the Retrofit s...

Страница 10: ...pplication Processor Line Trunk cards for the former system can be used for the Retrofit system except for the cards described above NOTE 5 PN 8LC 8COT cards cannot be used on 64 port PIM NOTE 6 PN 4D...

Страница 11: ...EM FORMER SYSTEM RETROFIT SYSTEM 48 PORT PIM 64 PORT PIM 72 PORT PIM 48 PORT PIM 64 PORT PIM 72 PORT PIM Number of PIMs 2 8 1 2 8 1 Number of LT Ports 88 512 72 88 384 64 512 NOTE 1 72 NOTE 7 Number o...

Страница 12: ...ers 88 8 384 8 72 8 88 16 256 16 64 16 512 16 NOTE 1 Station Speed Dial Numbers 3 000 3 000 3 000 4 000 4 000 4 000 10 000 NOTE 1 10 000 NOTE 1 10 000 NOTE 1 Number of Fault Messages 16 16 16 64 64 64...

Страница 13: ...ds assigned to the expanded AP time slot highway must be mounted in PIM0 Call Forwarding Outside Settings 240 240 240 240 240 240 496 NOTE 1 496 NOTE 1 496 NOTE 1 MP Built in SMDR Memory Calls Trunks...

Страница 14: ...ds 120 AP time slots The two additional T1 cards added to the system would have to be the PN 24DTA C cards Room must be made in PIM0 to accommodate the new PN 24DTA C cards on the expanded highway The...

Страница 15: ...mer system cannot be reloaded for the Retrofit system New data entry is required when the system is upgraded Graphical Configuration Report a MATWorX Add In tool is not available for the Retrofit syst...

Страница 16: ...71075 E Issue 1 0 Page 11 CHAPTER 2 INSTALLATION This chapter explains the hardware installation procedure mounting location the meaning of lamp indications and the method of switch settings of each...

Страница 17: ...ctricity Guard You must wear a grounded wrist strap to protect circuit cards from static electricity Figure 2 1 Static Electricity Guard 1 of 2 WHEN PLUGGING UNPLUGGING A CIRCUIT CARD WHEN HOLDING A C...

Страница 18: ...ached to the sheet for the work in which circuit cards are handled When performing such work the installer must be careful not to cause damage by static electricity WEAR A WRIST STRAP AND PERFORM THE...

Страница 19: ...ER 2 INSTALLATION Precautions Caution You must hold the edge of a circuit card when plugging or unplugging the circuit card If you touch another area you may be exposed to hazardous voltages CARD FRON...

Страница 20: ...gs Page 16 7 Mount the FP card PN CP17 into the FP slot 8 Unplug former clock card PN CK00 from PIM0 This card is no longer required PN CP16 has built in clock 9 Unplug former Expansion memory PN ME00...

Страница 21: ...SWITCH SETTINGS Table 2 1 shows the control cards for the Retrofit system MB Make Busy Table 2 1 List of Retrofit Control Cards NAME FUNCTIONAL NAME LAMP X PROVIDED NOT PROVIDED SWITCH X PROVIDED NOT...

Страница 22: ...CP16 MP Locations of Lamps Switches and Connectors EXCONN To CONNR connector on PZ M537 EXPMEM Lamp Indications LAMP NAME COLOR FUNCTION RUN Green Flashes at 120 IPM while this card is operating norm...

Страница 23: ...Call processing is stopped I O port As per CM40 Y 08 3 Off Line Call processing is stopped I O port 9600bps Fixed 5 NOTE 2 Off Line Call processing is stopped I O port 9600bps 6 NOTE 2 Off Line Call p...

Страница 24: ...nput Phase Locked Oscillator For clock receiver office For clock source office SW2 2 SW2 3 OFF OFF 4 ON When using RS1 port for built in MODEM OFF When using RS1 port for RS 232C Continued SWITCH NAME...

Страница 25: ...source office SW4 3 SW4 4 OFF OFF VR Rotary SW Variable Resister for External Hold Tone Source 0 20 Kohms Clockwise DK Connector 02 Ground detection 01 Ground sending Continued SWITCH NAME SWITCH NUM...

Страница 26: ...olumn indicate the standard setting of the switch When the switch is not set as shown by the figure and the setting of the switch varies with the system concerned JP0 Jumper pin UP Not used Memory bac...

Страница 27: ...ssue 1 0 CHAPTER 2 INSTALLATION Lamp Indications and Switch Settings PN CP17 FP Locations of Lamps Switches and Connectors Lamp Indications LAMP NAME COLOR FUNCTION RUN Green Flashes at 120 IPM while...

Страница 28: ...ned NOTE 1 Set the groove on the switch to the desired position NOTE 2 When the power is on flip the MB switch to ON UP position before plugging unplugging the circuit card SWITCH NAME SWITCH NUMBER S...

Страница 29: ...NEAX2000 IVS Retrofit System Guide ND 71075 E Issue 1 0 Page 25 CHAPTER 3 LEN LAYOUT This chapter gives a visual layout of each PIM type before and after the installation of the retrofit...

Страница 30: ...0288 0292 0296 0300 0304 0308 0312 0316 LT0 LT1 LT2 LT3 LT4 LT5 LT6 LT7 LT8 LT9 LT10 LT11 LT12 LT13 LT14 LT15 0195 0199 0203 0207 0211 0215 0219 0223 0227 0231 0235 0239 0243 0247 0251 0255 0194 0198...

Страница 31: ...424 428 432 436 440 444 448 452 456 460 LT0 LT1 LT2 LT3 LT4 LT5 LT6 LT7 LT8 LT9 LT10 LT11 LT12 LT13 LT14 LT15 303 307 311 315 319 323 327 331 335 339 343 347 351 355 359 363 302 306 310 314 318 322 3...

Страница 32: ...074 0082 0001 0009 0017 0025 0033 0041 0049 0057 0065 0073 0081 0000 0008 0016 0024 0032 0040 0048 0056 0064 0072 0080 PIMN UB Slot 0 2 4 6 8 10 12 14 0 2 4 LTC 0 LTC 1 LTC 2 PIMQ UA Slot 00 01 02 03...

Страница 33: ...se voltages It is recommended that the APR adapter be used in dual port mode to provide for single line devices NOTE 1 NOTE 2 NOTE 3 PIM 1 0127 0071 0079 0087 0095 0130 0111 0126 0070 0078 0086 0094 0...

Страница 34: ...connected to PWR0B The system power supply does not provide these voltages It is recommended that the APR adapter be used in dual port mode to provide for single line devices NOTE 1 NOTE 2 NOTE 3 PIM...

Отзывы: