Step 7
Put the capstan belt A temporarily as shown below.
Step 8
Put the capstan belt B on the motor ass’y pulley.
Step 9
Install the sub chassis to the mechanism, and then
tighten screws.
Step 10
Remove 3 screws.
Step 11
Put the capstan belt B as shown below.
Step 12
Put the capstan belt A on the motor ass’y pulley.
34
SA-AK330GC / SA-AK330GN
Содержание SA-AK330GC
Страница 9: ...8 Operation Procedures 9 SA AK330GC SA AK330GN ...
Страница 10: ...10 SA AK330GC SA AK330GN ...
Страница 55: ...15 Voltage Measurement 55 SA AK330GC SA AK330GN ...
Страница 56: ...56 SA AK330GC SA AK330GN ...
Страница 87: ...21 Troubleshooting Guide 87 SA AK330GC SA AK330GN ...
Страница 89: ...22 1 Deck Mechanism RAA4502 S 22 1 1 Deck Mechanism Parts Location 89 SA AK330GC SA AK330GN ...
Страница 90: ...90 SA AK330GC SA AK330GN ...
Страница 92: ...22 2 CD Loading Mechanism RD DAC026 S 22 2 1 CD Loading Mechanism Parts Location 92 SA AK330GC SA AK330GN ...
Страница 93: ...93 SA AK330GC SA AK330GN ...
Страница 95: ...22 3 1 Cabinet Parts Location 22 3 Cabinet 95 SA AK330GC SA AK330GN ...
Страница 96: ...96 SA AK330GC SA AK330GN ...
Страница 106: ...22 6 Packaging 106 SA AK330GC SA AK330GN PRT0411 P S J N A E ...