•
Follow the (Step 1) - (Step 2) of Item 8.1.
•
Follow the Disassembly for the CD Lid of Item 8.2.1.
•
Follow the Disassembly for the CD changer unit of Item
8.2.2.
•
Follow the (Step 1) - (Step 8) of Item 8.4
•
Follow the (Step 1) - (Step 7) of Item 8.5
Step 1 Install the belt temporarily.
NOTE:
Take care not apply the grease to the belt.
Step 2 Upset the CD loading unit.
Step 3 Remove 3 screws.
Step 14 Install the tray base, traverse ass’y, mechanism cover
and upper plate.
[Operation check after servicing]
Check the proper operation of following items with gear and
hexagonal screwdriver.
1. Open/close of tray base.
2. Moving the tray base to the stock side.
3. UP/DOWN operation of spindle base unit.
4. UP/DOWN operation of traverse ass’y.
Step 4 Unsolder the plunger terminals (2 points).
Step 5 Unsolder the motor terminals (2 points).
Step 6 Release the 2 claws (A), and then remove the Motor
P.C.B.
Step 7 Release the claw (B), and then remove the motor ass’y.
[Notice for motor ass’y installation]
8.7. Replacement for the motor ass’y
27
SA-AK110P /
Содержание SA-AK110P
Страница 7: ...7 Operation Procedures 7 SA AK110P ...
Страница 76: ...19 Troubleshooting Guide 76 SA AK110P ...
Страница 78: ...20 1 Deck Mechanism RAA4502 S 20 1 1 Deck Mechanism Parts Location 78 SA AK110P ...
Страница 79: ...79 SA AK110P ...
Страница 81: ...20 2 CD Loading Mechanism RD DAC026 S 20 2 1 CD Loading Mechanism Parts Location 81 SA AK110P ...
Страница 82: ...82 SA AK110P ...
Страница 84: ...20 3 1 Cabinet Parts Location 20 3 Cabinet 84 SA AK110P ...
Страница 85: ...85 SA AK110P ...
Страница 86: ...86 SA AK110P ...