NR-BW414 / NR-BW464
- 22 -
6. Manual defrosting information
1) Remove AL. foil tape.
2) Short circuit J1 & J2.
Heater defrost will be on.
3) After cleaned ice forming,
compressor and fan motor will be operated.
7. After assemble part to unit completed, please check whether function is OK as follows.
1) Lamp is on.
2) Compressor is working.
3) Fan motor is on and working.
•
Countermeasure No. 2
2.1 To add one deflector
•
Countermeasure No. 3
3.1 Pas control CNRBG-166465 replace.
New PCB control have circle marking on top of Capacitor spec 450V.
Add deflector 1 pcs.
DWG : Deflector have 1 pcs.
J1&J2