1. Pour 275 ± 15cc (9ozs
s
± 1/2oz) of 20°C ± 5°C (68° ± 9°F) water in a
beaker which is graduated to 600cc, and place in the center of the
oven.
2. Set the radiation monitor to 2450MHz and use it following the
manufacturer's recommended test procedure to assure correct results.
3. When measuring the leakage, always use the 2 inch (5cm) spacer
supplied with the probe.
4. Tap the start pad or set the timer and with the magnetron oscillating,
measure the leakage by holding the probe perpendicular to the
surface being measured.
12.2.1. Measurement with the outer panel removed.
Whenever you replace the magnetron, measure for radiation leakage before the outer panel is
installed and after all necessary components are replaced or adjusted. Special care should be taken in
measuring around the magnetron.
WARNING
Avoid contacting any high voltage parts.
12.2.2. Measurements with a fully assembled oven.
After all components, including outer panel are fully assembled, measure for radiation leakage around
the door periphery, the door viewing window, the exhaust opening and air inlet openings.
12.3. Record keeping and notification after measurement
- After any adjustment or repair to a microwave oven, a leakage reading
must be taken. Record this leakage reading on the repair ticket even if
it is zero.
A copy of this repair ticket and the microwave leakage reading should
be kept by repair facility.
- Should the radiation leakage be more than 2 mW/cm
2
(1mW/cm for
Canada) after determining that all parts are in good condition,
functioning properly, and genuine replacement parts as listed in this
manual have been used, immediately notify PASC, PSC or PCI.
12.4. At least once a year, have the radiation monitor checked for
calibration by its manufacturer.
33
Содержание NN-P295
Страница 3: ...3 ...
Страница 4: ...4 ...
Страница 5: ...5 ...
Страница 6: ...1 SCHEMATIC DIAGRAM 1 1 APH NN P295 H275 1 2 APH NN S255 6 ...
Страница 7: ...1 3 APH NN H264 FR S254 FR 7 ...
Страница 8: ...1 4 CPH NN P295 H275 8 ...
Страница 9: ...1 5 CPH NN S255 S245 9 ...
Страница 10: ...2 MEASUREMENTS AND ADJUSTMENTS 10 ...
Страница 19: ...40 F607V6Z00AP LAMP COVER U 1 19 ...
Страница 30: ...30 ...
Страница 31: ...7 2 NN H275 APH CPH NN S255 APH CPH 31 ...
Страница 32: ...32 ...
Страница 33: ...7 3 NN S245 CPH H264 FR APH S254 FR APH 33 ...
Страница 34: ...34 ...
Страница 35: ...7 4 PARTS LIST 7 4 1 NN P295 APH CPH S255 APH CPH 35 ...
Страница 44: ...reserved Unauthorized copying and distribution is a violation of law 2 ...
Страница 45: ...3 ...
Страница 46: ...4 ...
Страница 47: ...5 ...
Страница 49: ...3 CONTROL PANEL CPH 7 ...
Страница 50: ...4 OPERATION AND DIGITAL PROGRAMMER CIRCUIT TEST PROCEDURE 4 1 To set clock 8 ...
Страница 55: ...6 SCHEMATIC DIAGRAM CPH 13 ...
Страница 76: ...13 TROUBLESHOOTING GUIDE 34 ...
Страница 81: ...13 3 How to check the semiconductors using an OHM meter 14 EXPLODED VIEW AND PARTS LIST 39 ...
Страница 89: ...20 DIGITAL PROGRAMMER CIRCUIT SCHEMATIC DIAGRAM 47 ...
Страница 90: ...21 DIGITAL PROGRAMMER CIRCUIT PARTS LIST 48 ...