1. Disconnect 2 lead wires from turntable motor terminals.
2. Remove 1 screw holding turntable motor.
3. Release from retainer tab by turn spinning certain angle, remove
turntable.
10. COMPONENT TEST PROCEDURE
CAUTION [NEW. H.V.]
1. High voltage is present at the high voltage
terminal of the High Voltage Inverter (U) including
aluminum heat sink during any cook cycle.
2. It is neither necessary nor advisable to attempt
measurement of the high voltage.
3. Before touching any oven components, or
wiring, always unplug the oven from its power
source and discharge the high voltage capacitors.
10.1. Primary latch switch, secondary (secondary latch switch and power
relay B) interlocks.
1. Unplug the lead connectors to Power Relay B and verify continuity of
the power relay B 1-2 terminals.
2. Unplug lead connectors to Primary Latch Switch and Secondary Latch
Switch.
3. Test the continuity of switches at door opened and closed positions
with ohm meter (low scale). / Normal continuity readings should be as
follows.
10.2. Short switch & monitor
1. Unplug lead wires from Inverter Power Supply (U) primary terminals.
2. Connect test probes of ohm meter to the disconnected leads which
27
Содержание NN-P295
Страница 3: ...3 ...
Страница 4: ...4 ...
Страница 5: ...5 ...
Страница 6: ...1 SCHEMATIC DIAGRAM 1 1 APH NN P295 H275 1 2 APH NN S255 6 ...
Страница 7: ...1 3 APH NN H264 FR S254 FR 7 ...
Страница 8: ...1 4 CPH NN P295 H275 8 ...
Страница 9: ...1 5 CPH NN S255 S245 9 ...
Страница 10: ...2 MEASUREMENTS AND ADJUSTMENTS 10 ...
Страница 19: ...40 F607V6Z00AP LAMP COVER U 1 19 ...
Страница 30: ...30 ...
Страница 31: ...7 2 NN H275 APH CPH NN S255 APH CPH 31 ...
Страница 32: ...32 ...
Страница 33: ...7 3 NN S245 CPH H264 FR APH S254 FR APH 33 ...
Страница 34: ...34 ...
Страница 35: ...7 4 PARTS LIST 7 4 1 NN P295 APH CPH S255 APH CPH 35 ...
Страница 44: ...reserved Unauthorized copying and distribution is a violation of law 2 ...
Страница 45: ...3 ...
Страница 46: ...4 ...
Страница 47: ...5 ...
Страница 49: ...3 CONTROL PANEL CPH 7 ...
Страница 50: ...4 OPERATION AND DIGITAL PROGRAMMER CIRCUIT TEST PROCEDURE 4 1 To set clock 8 ...
Страница 55: ...6 SCHEMATIC DIAGRAM CPH 13 ...
Страница 76: ...13 TROUBLESHOOTING GUIDE 34 ...
Страница 81: ...13 3 How to check the semiconductors using an OHM meter 14 EXPLODED VIEW AND PARTS LIST 39 ...
Страница 89: ...20 DIGITAL PROGRAMMER CIRCUIT SCHEMATIC DIAGRAM 47 ...
Страница 90: ...21 DIGITAL PROGRAMMER CIRCUIT PARTS LIST 48 ...