Page 3-16
3-7
Board Transfer Test
After adjusting the board rail width and support pins, the board transfer test is carried out on the
board transfer screen. The board transfer end position blinks as Carry in
→
Load
→
Unload
→
Carry out and on the screen during board transferring.
NOTICE
Actually, the transfer test for whole line is carried out. This section describes the
board on the rear conveyor in the pre-station after the transfer test before the pre-
station.
1.
Turn ON the servo switch.
2.
Press
Product
config
.
• The production setting screen appears.
3.
Press PCB transfer .
• The board transfer screen appears.
193C-E-EMA03-A02-00
To the next page
OFF ( ) ON ( )
SERVO
193C-EOp-Pc-001
Содержание KXF-193C
Страница 2: ......
Страница 10: ...Page 10 193C E EMA00 A02 01 INDEX AppendixA RECOGNITION DEVICE ...
Страница 32: ...Page 32 193C E EMA00 A04 01 MEMO ...
Страница 46: ...Page 1 14 193C E EMA01 A01 01 MEMO ...
Страница 80: ...Page 3 26 193C E EMA03 A02 01 MEMO ...
Страница 128: ...Page 4 48 193C E EMA04 A03 01 MEMO ...
Страница 158: ...Page 5 30 193C E EMA05 A01 01 MEMO ...
Страница 176: ...Page 6 18 193C E EMA06 A01 01 MEMO ...
Страница 192: ...Page 7 16 193C E EMA07 A01 01 MEMO ...
Страница 202: ...Page 8 10 193C E EMA08 A01 01 MEMO ...
Страница 206: ...Page 4 193C E EMA0Z A01 01 MEMO ...