to include integrated services.
3. Facsimile Call Time Series
Facsimile Call Time Series
As shown in the following diagram, the facsimile call time series is divided into five phases.
Phase A : Call setting
Call setting can be manual/automatic.
Phase B : Pre-message procedure
Phase B is a pre-processing procedure and sequence for confirming the status of the terminal,
transmission route, etc., and for terminal control. It implements terminal preparation status,
determines and displays terminal constants, confirms synchronizationstatus, etc. and prepares
for transmission of facsimile messages.
Phase C : Message transmission
Phase C is the procedure for the transmitting facsimile messages.
Phase D : Post message procedure
Phase D is the procedure for confirming that the message is completed and received. For
continuous transmission, phase B or phase C is repeated for transmission.
Phase E : Call retrieval
Phase E is the procedure for call retrieval, that is for circuit disconnection.
4. Concerning Transmission Time
[Transmission Time] = [Control Time] + [ Image Transmission Time] + [Hold Time]
Transmission time consists of the following.
Control time:
This is time at the start of transmission when the functions at the sending and receiving sides
are confirmed, the transmission mode is established, and transmission and reception are
synchronized.
Image transmission time:
This is the time required for the transmission of document contents (image data). In general, this
time is recorded in the catalog, etc.
Hold time:
This is the time required after the document contents have been sent to confirm that the
document was actually sent, and to check for telephone reservations and/or the existence of
continuous transmission.
174
Содержание KX-FP342CX
Страница 34: ...3 Open the back cover 4 Remove the jammed recording paper 34 ...
Страница 38: ...1 Open the front cover by pulling up the center part Removethe jammed document carefully 38 ...
Страница 45: ...5 1 DISASSEMBLY FLOW CHART 5 1 1 UPPER CABINET SECTION 45 ...
Страница 48: ...5 2 2 HOW TO REMOVE THE OPERATION PANEL BLOCK 48 ...
Страница 49: ...5 2 3 HOW TO REMOVE THE OPERATION BOARD AND LCD 49 ...
Страница 50: ...5 2 4 HOW TO REMOVE THE IMAGE SENSOR CIS 50 ...
Страница 51: ...5 2 5 HOW TO REMOVE THE THERMAL HEAD 51 ...
Страница 52: ...5 2 6 HOW TO REMOVE THE PLATEN ROLLER AND BACK COVER 52 ...
Страница 53: ...5 2 7 HOW TO REMOVE THE PICKUP ROLLER 53 ...
Страница 54: ...5 2 8 HOW TO REMOVE THE CASSETTE LEVER 54 ...
Страница 55: ...5 2 9 HOW TO REMOVE THE BOTTOM FRAME 55 ...
Страница 56: ...5 2 10 HOW TO REMOVE THE DIGITAL ANALOG POWER SUPPLY SENSOR BOARDS AND AC INLET 56 ...
Страница 57: ...5 2 11 HOW TO REMOVE THE MOTOR BLOCK AND SEPARATION ROLLER 57 ...
Страница 58: ...5 2 12 HOW TO REMOVE THE GEARS OF MOTOR BLOCK 58 ...
Страница 59: ...5 3 INSTALLATION POSITION OF THE LEAD WIRES 59 ...
Страница 72: ...2 Left margin Top margin 3 Thermal head 1 dot 72 ...
Страница 75: ...CROSS REFERENCE PROGRAM MODE TABLE 6 4 2 PROGRAM MODE TABLE 75 ...
Страница 79: ...Note The above values are the default values 6 5 3 HISTORY 79 ...
Страница 88: ...Fig B 88 ...
Страница 96: ...6 6 4 12 A BLANK PAGE IS RECEIVED 96 ...
Страница 113: ...SERVICE FUNCTION TABLE Note If the problem remains see the following Countermeasure flow chart 113 ...
Страница 114: ...CROSS REFERENCE TEST FUNCTIONS 114 ...
Страница 115: ...CROSS REFERENCE TEST FUNCTIONS 115 ...
Страница 116: ...CROSS REFERENCE TEST FUNCTIONS 116 ...
Страница 117: ...CROSS REFERENCE TEST FUNCTIONS 117 ...
Страница 118: ...118 ...
Страница 119: ...119 ...
Страница 120: ...120 ...
Страница 125: ...125 ...
Страница 130: ...6 6 7 1 CHECK THE STATUS OF THE DIGITAL BOARD 130 ...
Страница 132: ...CROSS REFERENCE NG EXAMPLE CHECK THE STATUS OF THE DIGITAL BOARD POWER SUPPLY BOARD SECTION 132 ...
Страница 136: ...3 No ring tone or No bell CROSS REFERENCE CHECK SHEET 136 ...
Страница 139: ...6 6 9 2 TROUBLESHOOTING FLOW CHART 139 ...
Страница 140: ...140 ...
Страница 141: ...141 ...
Страница 145: ...CROSS REFERENCE TEST FUNCTIONS 6 6 13 THERMAL HEAD SECTION Refer to THERMAL HEAD 145 ...
Страница 146: ...7 CIRCUIT OPERATIONS 7 1 CONNECTION DIAGRAM 146 ...
Страница 149: ...7 3 CONTROL SECTION 7 3 1 BLOCK DIAGRAM 7 3 2 MEMORY MAP 149 ...
Страница 150: ...7 3 3 ASIC IC501 This custom IC is used for the general FAX operations 150 ...
Страница 152: ...152 ...
Страница 198: ...8 3 2 ITU T No 2 TEST CHART 198 ...
Страница 199: ...9 FIXTURES AND TOOLS 199 ...
Страница 200: ...10 CABINET MECHANICAL AND ELECTRICAL PARTS LOCATION 10 1 GENERAL SECTION 200 ...
Страница 201: ...10 2 OPERATION PANEL SECTION 201 ...
Страница 202: ...10 3 BACK COVER SECTION 202 ...
Страница 203: ...203 ...
Страница 204: ...10 4 UPPER CABINET SECTION 204 ...
Страница 205: ...10 5 LOWER CABINET P C BOARD SECTION 205 ...
Страница 206: ...CROSS REFERENCE MOTOR SECTION 10 6 MOTOR SECTION 206 ...
Страница 207: ...10 7 ACTUAL SIZE OF SCREWS 11 ACCESSORIES AND PACKING MATERIALS 207 ...
Страница 232: ...SW502 SW501 CN501 CHECK PFUP1301ZA 1 3 KX FP342CX SENSOR BOARD PCB5 ...
Страница 241: ...CN501 1 COVER OPEN 2 READ 3 GND SW501 READ SW502 COVER OPEN SW 1 3 2 4 KX FP342CX SENSOR BOARD PCB5 ...