7-43
7.17.3
117B
Tool Operation - Positioning
The test run is possible like actual positioning operations.
Specifying the starting table number enables to check if the positioning/interpolation from the starting
table operates properly.
Note:
For the positioning operation, the setting data should be downloaded to the positioning unit in advance.
For the positioning operation, the equivalent axes should be in the state that the servo is locked (Servo
ON).
The operations after the starting table number vary depending on the Operation patterns.
1. Click [Positioning] in the Tool operation dialog. The following dialog is shown.
Axis [Group]
The axis numbers and group names to be monitored.
Synchronous group
Displays the current synchronous group.
Synchronous mode
Displays the current synchronous mode.
Synchronous
condition
Displays the current synchronous state (synchronous or asynchronous).
Click [Change synchronous] to display the dialog for changing the
synchronous setting.
Current value
Monitor the feedback values after the unit system conversion for each axis.
Current value update
Click [Current value update] to display the dialog for inputting value to
change the preset value.
Unit
The unit of position for each axis specified in the parameter settings.
Active table number
Monitor the table number during the operation or when it completes.
Starting table number
The starting table number for the positioning control.
Click [Change] to change the starting table number.
Содержание FP? Positioning Unit RTEX
Страница 1: ......
Страница 6: ...iv ...
Страница 14: ...xii ...
Страница 15: ...Chapter 1 Functions of Unit and Restrictions on Combination ...
Страница 21: ...Chapter 2 Parts and Functions ...
Страница 22: ...2 2 2 1 Parts and Functions FPΣ Positioning Unit RTEX FP2 Positioning Unit RTEX ...
Страница 24: ...2 4 ...
Страница 25: ...Chapter 3 Wiring ...
Страница 27: ...3 3 3 2 Network Connector RJ45 plug is connected to the network connector Pins of RJ45 plug Connecting diagram ...
Страница 31: ...Chapter 4 Power On Off and Items to Check ...
Страница 36: ...4 6 ...
Страница 37: ...Chapter 5 4BPreparation For Operation ...
Страница 45: ...Chapter 6 5BI O Allocation ...
Страница 53: ...Chapter 7 6BSetting Tool Configurator PM ...
Страница 83: ...7 31 Setting Font Select Option Font in the menu bar The following dialog is shown ...
Страница 102: ...7 50 ...
Страница 103: ...Chapter 8 7BAutomatic Operation Position Control ...
Страница 118: ...8 16 ...
Страница 119: ...8 17 When the X axis and Y axis is the moving axes each axis in the above diagram is replaced ...
Страница 141: ...Chapter 9 8BManual Operation JOG Operation ...
Страница 146: ...9 6 ...
Страница 147: ...Chapter 10 9BManual Operation Home Return ...
Страница 155: ...Chapter 11 10BManual Operation Pulser Operation ...
Страница 159: ...Chapter 12 11BStop Functions ...
Страница 162: ...12 4 ...
Страница 163: ...Chapter 13 12BSupplementary Functions ...
Страница 177: ...13 15 Sample program When reading AMP parameter No 1 1 of axis 1 with A6N or A5N ...
Страница 179: ...13 17 Sample program When writing AMP parameter No 1 1 of axis 1 with A6N or A5N ...
Страница 183: ...Chapter 14 Precautions During Programming ...
Страница 187: ...Chapter 15 Errors and Warnings ...
Страница 212: ...15 26 ...
Страница 213: ...Chapter 16 Troubleshooting ...
Страница 214: ...16 2 16 1 Cannot Communication With AMP ...
Страница 215: ...Chapter 17 Specifications ...
Страница 275: ...Chapter 18 Dimensions ...
Страница 276: ...18 2 18 1 FPSigma Positioning Unit RTEX ...
Страница 277: ...18 3 18 2 FP2 Positioning Unit RTEX ...
Страница 278: ...18 4 ...
Страница 279: ...Chapter 19 Sample Programs ...
Страница 283: ...19 5 ...
Страница 286: ...19 8 ...
Страница 288: ......