2
TABLE OF CONTENTS
PAGE
PAGE
1 Safety Precautions
-----------------------------------------------
3
1.1. General guidelines -----------------------------------------3
2 Warning
--------------------------------------------------------------
4
2.1. Prevention of Electrostatic Discharge (ESD)
to Electrostatic Sensitive (ES) Devices ---------------4
2.2. How to Recycle the Lithium Ion Battery (U.S.
Only)-----------------------------------------------------------4
2.3. How to Replace the Lithium Battery -------------------5
3 Service Navigation
------------------------------------------------
6
3.1. Introduction --------------------------------------------------6
3.2. General Description About Lead Free Solder
(PbF) ----------------------------------------------------------6
3.3. Important Notice 1:(Other than U.S.A.) ---------------6
3.4. Static Electricity Protection Measures ----------------6
3.5. Ground for electrostatic breakdown
prevention ----------------------------------------------------6
3.6. Handling of Traverse unit (optical pick-up) ----------7
4 Specifications
------------------------------------------------------
8
4.1. Others (Licenses) ---------------------------------------- 10
5 Location of Controls and Components
------------------
11
6 Service Mode
-----------------------------------------------------
14
7 Troubleshooting Guide
----------------------------------------
20
7.1. Self-Diagnosis Functions ------------------------------ 20
8 Service Fixture & Tools
---------------------------------------
22
9 Disassembly and Assembly Instructions
---------------
23
9.1. Disassembly Flow Chart-------------------------------- 23
9.2. P.C.B. location -------------------------------------------- 24
9.3. Main cabinet unit ----------------------------------------- 24
9.4. Traverse Unit ---------------------------------------------- 25
9.5. Main P.C.B. ------------------------------------------------ 25
9.6. Operation P.C.B. ----------------------------------------- 25
9.7. Disc cover ------------------------------------------------- 26
9.8. Monitor assembly---------------------------------------- 26
9.9. Monitor cover --------------------------------------------- 27
9.10. Mono arm -------------------------------------------------- 27
9.11. LCD panel ------------------------------------------------- 28
9.12. Cleaning of the Optical Pick-up ---------------------- 29
10 Measurements and Adjustments
--------------------------
30
10.1. Service Positions ---------------------------------------- 30
10.2. Caution for Replacing Parts--------------------------- 33
10.3. Adjustment Instruction when Exchange the
Traverse or Main P.C.B. (Servo Adjustment) ----- 34
11 Block Diagram
---------------------------------------------------
38
11.1. Overall Block Diagram---------------------------------- 38
12 Schematic Diagram
--------------------------------------------
39
12.1. Interconnection Schematic Diagram---------------- 39
12.2. OPERATION Schematic Diagram ------------------- 40
12.3. HP_REMOCON SCHEMATIC DIAGRAM--------- 41
12.4. LCD_SW SCHEMATIC DIAGRAM------------------ 41
12.5. BAT-CONNECTOR SHEMATIC DIAGRAM------- 41
12.6. SPEAKER SCHEMATIC DIAGRAM ---------------- 41
13 Printed Circuit Board
------------------------------------------
42
13.1. OPERATION P.C.B.------------------------------------- 42
13.2. HP_REMOCON P.C.B. -------------------------------- 44
13.3. BAT-CONNECTOR P.C.B. ---------------------------- 45
13.4. LCD_SW P.C.B. and SPEAKER P.C.B. ----------- 46
14 Appendix for Schematic Diagram
-------------------------
47
14.1. Voltage and Waveform Chart ------------------------- 47
15 Exploded View and Replacement Parts List
-----------
50
15.1. Exploded Views ------------------------------------------ 50
15.2. Electrical Replacement Parts List ------------------- 54
Содержание DMP-B100EB
Страница 10: ...10 4 1 Others Licenses ...
Страница 11: ...11 5 Location of Controls and Components B100P ...
Страница 12: ...12 B100PC ...
Страница 13: ...13 ...
Страница 23: ...23 9 Disassembly and Assembly Instructions 9 1 Disassembly Flow Chart ...
Страница 31: ...31 10 1 2 Checking and Repairing of Main P C B 2 ...
Страница 51: ...51 15 1 2 Packing Accessories Section PC8 PC4 PC2 PC7 A2 A5 A8 A5 A1 A1 1 A4 A15 A10 PC1 PC3 ...