![Panasonic CU-5E34NBE-C Скачать руководство пользователя страница 62](http://html1.mh-extra.com/html/panasonic/cu-5e34nbe-c/cu-5e34nbe-c_technical-and-service-manual_4708706062.webp)
20
English
BLK
WHT
RED
TERMINAL BASE
IND LAMP
ASSY
TO OUTDOOR UNIT
WHT
BLK
BLK
BLK
BLK
BLK
BLK
BLK
BLK
YEL
BRN
BLU
PNK
RED
SI
AC1 AC2
FLAP
5P(WHT)
LAMP
CONTROLLER
FLAP MOTOR
FAN MOTOR
CONNECTOR
UV
2P(RED)
4P(WHT)
10P(WHT)
HA
JEM-A
1
2
3
4
5
1
2
3
4
5
2
3
4
2
3
4
1
5
1
5
1
2
3
4
5
1
2
3
4
5
6
7
8
9
6
7
8
9
1
2
3
4
5
1
2
3
4
5
6
7
8
9
6
7
8
9
BLK
10
10
10
10
BLU
YEL
WHT
BLK
RED
4
5
DCM
6P(BLU)
6
4
5
6
1
2
3
1
2
3
FM
ROOM/COIL
4P(WHT)
1
2
1
2
3
4
3
4
1
2
1
2
1 2 3 4
FLAP
1
2
3
4
GND
E
ROOM
THERMISTOR
COIL
THERMISTOR
GRY
GRY
BLK
BLK
GRY
GRY
BLK
BLK
GRN
GRN/YEL
EVAPORATOR
PL MTG
8FA-2-5251-19400-1
FERRITE CORE
FERRITE CORE
PL MTG
CS-ME18NKE, CS-ME24NKE
Fig. 33b
BLK
RED
GND
WHT
WHT
TERMINAL BASE
FERRITE CORE
IND LAMP
ASSY
TO OUTDOOR UNIT
RED
WHT
WHT
WHT
WHT
WHT
WHT
WHT
WHT
YEL
BRN
BLU
PNK
RED
SI-2
SI
AC IN
AC IN-2
FLAP
5P(WHT)
LAMP
CONTROLLER
FLAP MOTOR
FAN MOTOR
CONNECTOR
4P(WHT)
9P(WHT)
HA
JEM-A
1
2
3
4
5
2
3
4
1
5
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
BLU
YEL
WHT
BLK
RED
4
5
DCM
6P(BLU)
E
6
4
5
6
1
2
3
1
2
3
FM
ROOM/COIL/UV
6P(WHT)
ROOM
THERMISTOR
COIL
THERMISTOR
GRY
GRY
1
2
BLK
BLK
GRY
GRY
BLK
BLK
3
4
5
6
1 2 3 4
FLAP
GRN
FERRITE CORE
FERRITE CORE
FERRITE CORE
PL MTG
GRN/YEL
EVAPORATOR
PL MTG
1
2
3
1
2
3
4
5
6
1
2
3
4
5
1
2
3
4
5
6
7
8
9
1
2
3
4
5
1
2
3
4
5
6
7
8
9
8FA-2-5251-19600-1
CS-ME7NKE, CS-ME9NKE, CS-ME12NKE
Fig. 33a
8. Installation Check Sheet
The strength of the installation location is sufficient to support the air conditioner weight.
The indoor and outdoor units are installed level and vertically.
The power and voltage are as specified.
Inter-unit cables are securely fastened to the terminal board.
Inter-unit cables are securely fixed.
The power cable and inter-unit cables are not connected anywhere along their paths.
The ground wire is securely connected.
An air purge of the refrigerant circuit has been conducted.
A leak test of the tubing connections has been performed.
Thermal insulation has been applied to the tubing connections.
Drain connections are secure and water drains properly.
Putty has been used to close the hole in the wall.
All service valves are fully open.
Remote controller signals are being positively received.
9. Electric Wiring Diagram
(Indoor Unit)
Diagrama de cableado eléctrico
(Unidad interior)
Diagramme de câblage électrique
(Appareil intérieur)
Elektrisches Schaltbild
( Innenraumgerät)
Diagramma dei circuiti elettrici
(Unità Interna)
Diagrama da fiação elétrica
(Unidade interior)
¢È¿ÁÚ·ÌÌ· ËÏÂÎÙÚÈ΋˜ ηψ‰›ˆÛ˘
(
∂ÛˆÙÂÚÈ΋ ÌÔÓ¿‰·
)
12-401 CU-5E34NBE_OU EN_1.qxd 3/12/12 5:05 PM Page 20
Содержание CU-5E34NBE-C
Страница 41: ......
Страница 42: ...INSTALLATION INSTRUCTIONS CU 5E34NBE 852 6 4190 578 00 1 APPENDIX A A 1...
Страница 84: ......
Страница 104: ......
Страница 124: ......
Страница 144: ......
Страница 164: ......
Страница 166: ...2 1 5 m R410A...
Страница 167: ...3 A A E A...
Страница 173: ...9 2 3 5 5 15 x 40 15 5 5 3 OXI 5 20 10 50 25 15 15 4 40 5 2 2 20 5 5...
Страница 175: ...11 3 3 1 3 5 26 3 2 2 7 3 3 3 4 1 30 50 2 8 9 3 4 10 11 RIDGID 11 10 8 7 0 0 5 1 2 R410A 9...
Страница 179: ...15 1 B E 22 2 E 23 3 0 05 0 1 MPaG 0 5 1 2G B E 23 5 10 4 24 22 23 E B A B A E o 24...
Страница 180: ...16 5 5 1 1 2 25 3 4 5 6 A O 5 2 6 A 25 A B 6 245 IEC 57 H05RN F GP85PCP 6 3 5 1 0 CU 5E34NBE 26 30 25 A B A A E 1 2...
Страница 183: ...19 1 C 32 2 3 10 4 5 6 2 15 C OFF 7 HA 4P 9 8 O C 32...
Страница 184: ......
Страница 186: ...DC1203 0...